A central air-conditioning variable load rate adjustment control method based on parameter serialization
A central air-conditioning, adjustment and control technology, applied in the direction of machinery and equipment, can solve the problem of increased pressure on the safe operation of the power grid
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0080] In each minimum control cycle, the central air-conditioning system has two load groups, cooling state and non-cooling state, respectively expressed as and Among them, t is the moment studied, K t and G t is the load group in cooling state and non-cooling state at time t, and the number of loads contained in it is m 1 and m 2 , the number of controllable equipment is m=m 1 +m 2 . It can be seen that as time changes, K t and G t The number of devices and their respective operating states will change, so m,m 1 ,m 2 The value will change with time t. According to the above description, the load group of all central air-conditioning equipment is expressed as
[0081] Define the operating temperature, lower temperature limit, upper temperature limit, temperature setting value, response group screening constraint temperature upper limit, lower limit, and temperature dead zone of the equipment group at time t, such as and In the formula, Respectively re...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


