A multi-objective optimization and energy system technology, which is applied in the field of multi-objective optimal scheduling based on the energy system of iron and steel enterprises, can solve problems such as failure to output scheduling schemes, non-convergence of the solution process, etc., to achieve economic cost and environmental protection, and solve multi-objectives The effect of optimizing the scheduling problem

Active Publication Date: 2020-04-14
NORTHEASTERN UNIV LIAONING
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For such complex strong constraints and multi-objective optimization problems, the solution process may not converge, and the optimal scheduling scheme cannot be output

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Multi-objective Optimal Scheduling Method Based on Iron and Steel Enterprise Energy System
  • A Multi-objective Optimal Scheduling Method Based on Iron and Steel Enterprise Energy System
  • A Multi-objective Optimal Scheduling Method Based on Iron and Steel Enterprise Energy System

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0055] In order to better explain the present invention and facilitate understanding, the present invention will be described in detail below through specific embodiments in conjunction with the accompanying drawings.

[0056] figure 1 It is a schematic flow chart of the multi-objective optimal scheduling method based on the energy system of iron and steel enterprises provided by an embodiment of the present invention. The execution subject of the method in this embodiment can be an independent processing device, such as a computer and other equipment. The multi-objective optimal scheduling includes the following steps :

[0057] S1. Obtain the network topology, dispatchable key equipment information, dispatch parameters and historical data of energy production and consumption of the energy system of the iron and steel enterprise, and determine the production conditions of the energy system in the future dispatch cycle; the energy system of the iron and steel enterprise includ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a multi-objective optimal scheduling method based on the energy system of iron and steel enterprises. The method includes: obtaining the topological structure of the energy system network of iron and steel enterprises, the information of key equipment that can be dispatched, and the historical data of energy production and consumption in past dispatch cycles; constructing a training data set according to the historical data of energy production and consumption; The corresponding energy production and consumption data constructs a prediction data set; the trained BP neural network is obtained through the training data set; Supply and demand first forecast data; based on the first forecast data, economic dispatch model, environmental cost model, schedulable key equipment model and constraints, establish a multi-objective optimal dispatch model, solve the multi-objective optimal dispatch model, and obtain the optimal solution of the energy system . The above method ensures the convergence of the calculation process and can obtain the optimal scheduling scheme.

Description

technical field [0001] The invention belongs to the field of energy dynamic balance and optimal scheduling of iron and steel enterprises, and in particular relates to a multi-objective optimal scheduling method based on the energy system of iron and steel enterprises. Background technique [0002] The iron and steel industry is a basic pillar industry of the national economy, a typical process-based industry, and a resource- and energy-intensive industry. It has the following characteristics: On the one hand, the production process of iron and steel enterprises is long, with various processes and equipment, and the processes are connected with each other, and each process and equipment are associated with multiple energy media; on the other hand, the types of energy that iron and steel enterprises need to use More than 20 types, among which the most important energy media are gas, steam, and electricity. These energy media not only have various forms of production and consum...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/04G06N3/04G06N3/08
CPCG06N3/084G06Q10/04G06Q10/0631G06Q50/04G06N3/044Y02P80/10Y02P90/30
Inventor 张琦倪团结马家琳高金彤
Owner NORTHEASTERN UNIV LIAONING
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products