Robust two-level optimization model and conversion equivalent method for real-time scheduling of wind power systems

A real-time scheduling and wind power system technology, applied in data processing applications, instruments, calculations, etc., can solve the problems of increasing the burden of AGC unit adjustment and increasing the operating cost of the power grid

Active Publication Date: 2020-07-07
SUQIAN POWER SUPPLY COMPANY OF JIANGSU PROVINCE POWER +2
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, this often increases the adjustment burden of the AGC unit, resulting in an increase in the operating cost of the grid

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Robust two-level optimization model and conversion equivalent method for real-time scheduling of wind power systems
  • Robust two-level optimization model and conversion equivalent method for real-time scheduling of wind power systems
  • Robust two-level optimization model and conversion equivalent method for real-time scheduling of wind power systems

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0139] If the system consists of thermal power generators (assuming all are AGC units), wind farms and loads, figure 1 It is a schematic diagram of a basic framework including a robust real-time scheduling model of a wind power system in an application embodiment of the present invention.

[0140] according to figure 1 In the dispatching framework shown, before the start of real-time dispatching, each node load and wind power need to report the predicted power values ​​Pd and PW in the forward-looking period, as well as the expected fluctuations around the predicted values. The purpose of real-time scheduling is to economically decide the base point PG and participation factor α of AGC units without considering the random faults of units and transmission lines, so as to satisfy the uncertainties of load and wind power as much as possible.

[0141] Assume that the expected up and down fluctuations of the load power on the basis of the predicted value are , , the fluctuatio...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a wind power system real-time dispatching-containing robust two-layer optimization model and a conversion equivalent method, belongs to the field of real-time dispatching of power systems, and particularly aims to minimize a difference between an allowable fluctuation amount of wind power and a random fluctuation amount under a condition of ensuring that the operation cost of a power grid is within an expected range to meet a load and wind power uncertainty as much as possible. The robust two-layer optimization model comprises an upper-layer problem and a lower-layer problem, wherein upper-layer problem pays attention to the operation safety of a power grid after wind power is accessed, so as to minimize a difference between the allowable fluctuation amount of the wind power and an expected fluctuation amount; the lower-layer problem forms a decision problem aiming at minimizing the operation cost of the power grid. The upper-layer and lower-layer problems in the model have an obvious hierarchical relation and have a close relation; operation constraints of all types of power grids can be met; the robustness of a decision result can be guaranteed.

Description

technical field [0001] The invention includes a robust two-layer optimization model for real-time scheduling of wind power systems and a conversion equivalent method, which belongs to the field of real-time scheduling of electric power systems, in particular a method that can minimize the allowable fluctuation of wind power under the condition that the operating cost of the power grid is within the expected range The difference from the random fluctuation amount, so as to meet the load and wind power uncertainty as much as possible. Background technique [0002] Power system real-time dispatching is the link between advanced dispatching and automatic generation control (AGC). Its core is to determine the base point and participation factors of AGC units on the basis of forward-looking functions. This decision determines whether AGC can achieve the expected control effect. In traditional There are several well-established decision-making methods in power systems. The AGC uni...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06312G06Q50/06
Inventor 刘新山刘国静李娟陈肯潘楠沙建秀樊贝郑宇
Owner SUQIAN POWER SUPPLY COMPANY OF JIANGSU PROVINCE POWER
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More