Water retaining dam structure
A technology for retaining dams and weep holes, applied in dams, arch dams, etc., can solve the problems of earthwork collapse engineering costs of retaining dams, and achieve good economic benefits, reasonable structure, and good mechanical properties
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] figure 1 A plan view of the retaining dam top, figure 2 It is a schematic diagram of the middle plane of the retaining dam.
[0025] In the embodiment, concrete column piers 1 are arranged every 5m. The concrete column piers 1 are concrete cylinders with a diameter of 1.2m. Concrete arch plates 2 are arranged between adjacent concrete column piers 1. The concrete arch plates 2 are prefabricated panels, and the concrete arch plates 2 The thickness is 60mm, the longitudinal positive and negative reinforcements have the same diameter and are symmetrically arranged, and the minimum reinforcement ratio is not less than 0.2%. Concrete arch 2 pre-embeds T-shaped bars, and concrete arch 2 every 1.8m 2 Drainage holes are left, concrete arch beams 3 are arranged vertically at intervals of 1.5-2.5m, and the height of concrete arch beams 3 is 200mm. Set anti-torsion reinforcement in 3, the diameter of anti-torsion reinforcement is 18mm, set backing column 7 at a distance of 11m...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com