A paving grab with screening function for tunnel bridge road construction
A road construction and functional technology, applied in the field of grab buckets, can solve problems such as easy attachment, grab buckets without screening or multi-stage screening, and shorten the service life of grab buckets, so as to save energy, diversify functions, and improve work efficiency. efficiency effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific illustrations.
[0019] Such as Figure 1 to Figure 5 As shown, a paving grab bucket for tunnel, bridge and road construction with screening function, including electric telescopic rod 3, first grab flap 8, second grab flap 11 and mounting seat 18, at the central position of the top of mounting seat 18 Mounting joint 19 is installed, and the two ends of mounting joint 19 are all provided with threaded interface, is convenient to the installation of grab bucket, and the outside of mounting base 18 tops is equipped with fixed mounting plate 1, is evenly provided with installation limit hole 24 on the fixed mounting plate 1 , so that the grab is installed on the mechanical arm more stably, the bottom end of the mounting base 18 is evenly equipped with a lighti...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


