Unlock instant, AI-driven research and patent intelligence for your innovation.

Project schedule management method and terminal equipment

A technology of project progress and management methods, applied in the field of project progress management methods and terminal equipment, can solve the problems of long software development cycle and low management efficiency, and achieve the effect of speeding up handover and circulation, shortening the cycle, and improving management efficiency

Active Publication Date: 2021-04-02
ONE CONNECT SMART TECH CO LTD SHENZHEN
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of this, the embodiment of the present invention provides a project schedule management method and terminal equipment to solve the problem in the prior art that the software development cycle is long due to the low efficiency of project schedule management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project schedule management method and terminal equipment
  • Project schedule management method and terminal equipment
  • Project schedule management method and terminal equipment

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0041] figure 1 The implementation flow of the project progress management method provided by the embodiment of the present invention is shown, and the method flow includes steps S101 to S104. The specific implementation principle of each step is as follows.

[0042] S101: Create a project view according to the received project creation instruction, where the project view includes a plurality of display areas arranged in sequence, and each of the display areas respectively represents a development stage of the project.

[0043] In the application client of the terminal device, various function keys are displayed. When it is detected that the item creation button is selected, an item creation instruction from the user may be received. This user can be, for example, the person in charge of the project or a project administrator. Creates project views associated with an engineering project based on project creation instructions. Engineering projects include but are not limite...

Embodiment 2

[0060] On the basis of the first embodiment above, the embodiment of the present invention further limits the binding method of the attribute object icon in the taskbar, as follows figure 2 As shown, the above S103 specifically includes:

[0061] S1031: Display a property object icon list in the item view, where the property object icon list includes a plurality of property object icons.

[0062] After the project view is created, a list of property object icons is displayed in the current project view. The project administrator can input the server connection address in the attribute object icon list, so that when the implementation member information in the remote server is successfully invoked, an attribute object icon identifying each implementation member can be generated in the attribute object icon list.

[0063] For example, if the project administrator enters the connection address of the company's domain server in the setting column of the attribute object icon lis...

Embodiment 3

[0069] On the basis of the first embodiment above, the embodiment of the present invention further limits the way of task flow in the software development project, as follows image 3 As shown, after the above S104, it also includes:

[0070] S105: At any moment, if it is detected that the color of any one of the attribute object icons changes, judge whether the color of each of the attribute object icons in the display area bound to the attribute object icon is the same as the color of the attribute object icon. the second preset value.

[0071] When it is detected that any implementation member issues a task completion instruction in a task bar bound to its attribute object icon, the color of the implementation member's attribute object icon is changed to a second preset value. At this point, the color of the attribute object icon changes.

[0072] Since the attribute object icon is displayed on the taskbar bound to it, and the taskbar is located in the display area, the d...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present application is applicable to the field of information management technologies and provides a project progress management method, device, terminal apparatus and medium. The method comprises: creating a project view according to a received project creation instruction, wherein the project view comprises multiple display areas which are sequentially arranged; generating multiple task columns in the display areas; binding a display attribute object icon to each of the task columns; and if a completion instruction related to one task is received, changing, in a task column corresponding to the task, a color of the bound display attribute object icon from a first preset value to a second preset value, so as to complete updating of a project progress. The present application can be used to enable each participating member of a project to intuitively look up a person in charge of an individual task, thereby ascertaining the execution progress of each task without complicated communications, improving the management efficiency of project progress and reducing software development cycles.

Description

technical field [0001] The invention belongs to the technical field of information management, and in particular relates to a project progress management method and terminal equipment. Background technique [0002] At present, each implementation link of the software development process is usually completed by engineers with different functions. For example, product requirements, UI design, front-end development, back-end development, software testing and other implementation links must be completed in sequence by corresponding engineers. However, if a certain implementation link is overdue, the project administrator of the development project needs to do a lot of communication work to determine which implementation link the problem is in and which engineer the task is stuck with. In addition, in the actual process, engineers in different implementation links may be distributed in different work locations, so the management of the entire software development process is cumb...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/10G06F3/0482G06F3/0484
CPCG06F3/0482G06F3/04847G06Q10/103
Inventor 唐晟
Owner ONE CONNECT SMART TECH CO LTD SHENZHEN