Project schedule management method and terminal equipment
A technology of project progress and management methods, applied in the field of project progress management methods and terminal equipment, can solve the problems of long software development cycle and low management efficiency, and achieve the effect of speeding up handover and circulation, shortening the cycle, and improving management efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] figure 1 The implementation flow of the project progress management method provided by the embodiment of the present invention is shown, and the method flow includes steps S101 to S104. The specific implementation principle of each step is as follows.
[0042] S101: Create a project view according to the received project creation instruction, where the project view includes a plurality of display areas arranged in sequence, and each of the display areas respectively represents a development stage of the project.
[0043] In the application client of the terminal device, various function keys are displayed. When it is detected that the item creation button is selected, an item creation instruction from the user may be received. This user can be, for example, the person in charge of the project or a project administrator. Creates project views associated with an engineering project based on project creation instructions. Engineering projects include but are not limite...
Embodiment 2
[0060] On the basis of the first embodiment above, the embodiment of the present invention further limits the binding method of the attribute object icon in the taskbar, as follows figure 2 As shown, the above S103 specifically includes:
[0061] S1031: Display a property object icon list in the item view, where the property object icon list includes a plurality of property object icons.
[0062] After the project view is created, a list of property object icons is displayed in the current project view. The project administrator can input the server connection address in the attribute object icon list, so that when the implementation member information in the remote server is successfully invoked, an attribute object icon identifying each implementation member can be generated in the attribute object icon list.
[0063] For example, if the project administrator enters the connection address of the company's domain server in the setting column of the attribute object icon lis...
Embodiment 3
[0069] On the basis of the first embodiment above, the embodiment of the present invention further limits the way of task flow in the software development project, as follows image 3 As shown, after the above S104, it also includes:
[0070] S105: At any moment, if it is detected that the color of any one of the attribute object icons changes, judge whether the color of each of the attribute object icons in the display area bound to the attribute object icon is the same as the color of the attribute object icon. the second preset value.
[0071] When it is detected that any implementation member issues a task completion instruction in a task bar bound to its attribute object icon, the color of the implementation member's attribute object icon is changed to a second preset value. At this point, the color of the attribute object icon changes.
[0072] Since the attribute object icon is displayed on the taskbar bound to it, and the taskbar is located in the display area, the d...
PUM