Precision Control Method of Steel Tube Arch Bolted Web Rod Hole Group

A technology of precision control and steel tube arch, applied in construction, bridge construction, bridges, etc., can solve the problems of low precision and high cost, improve production efficiency, reduce construction difficulty, and ensure the effect of hole rate

Active Publication Date: 2019-05-03
中铁宝桥(宝鸡)路桥建设有限公司
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] To solve the above-mentioned technical problems of high cost and low precision, the present invention provides a method for controlling the precision of steel pipe arch bolted web hole group

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Precision Control Method of Steel Tube Arch Bolted Web Rod Hole Group
  • Precision Control Method of Steel Tube Arch Bolted Web Rod Hole Group
  • Precision Control Method of Steel Tube Arch Bolted Web Rod Hole Group

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0026] The method for controlling the accuracy of steel pipe arch bolted web hole group comprises the following steps:

[0027] see figure 1 , provide gusset plate 1, after gusset plate 1 blanking is completed and checked, use CNC drilling machine or radial drilling machine to drill hole groups according to the construction drawing of gusset plate 1, and draw the gusset plate based on the drilled hole group Install positioning line 2;

[0028] see figure 2 , according to the ground tire map coordinates stakeout gusset plate installation positioning line 3, make arch rib pipe joints to extend the ground tire;

[0029] After the arch-ribbed pipe joint is connected to the ground tire, return the gusset plate installation positioning line 3 on the pipe joint according to the ground tire positioning point;

[0030] Please refer to image 3 , put the gu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an accuracy control method for a bolted-type web member hole group of a steel pipe arch. The accuracy control method comprises the following steps that a joint plate is provided, after the joint plate is discharged and examined to be qualified, hole group drilling is conducted through a numerical control drilling machine or a radial drilling machine according to a joint plate construction drawing, and a mounting positioning line of the joint plate is marked on the basis of the drilled hole group. The accuracy control method for the bolted-type web member hole group of the steel pipe arch has the following beneficial effects that the manufacturing and mounting accuracy is improved, and the via-hole rate of high-strength bolts is ensured; and the accuracy of the mounting positions of the joint plate and a web member is ensured, the construction difficulty is reduced, the production efficiency is improved, and the economic benefit is improved.

Description

technical field [0001] The invention relates to the manufacture and installation of steel bridges, in particular to a method for controlling the precision of steel pipe arch bolted web bar hole groups. Background technique [0002] With the rapid development of China's economy and the improvement of steel production capacity, the country's infrastructure has entered a stage of vigorous development. The construction of steel structure bridges can be seen everywhere, and the construction is difficult. Arch Concrete arch bridges are the preferred structural form. [0003] With the continuous progress of building materials, construction technology, and design theory, the span of arch bridges has broken records time and time again, and the form of arch bridges has become increasingly novel. Taking the steel pipe arch of the Zangmu Super Bridge currently under construction as an example, the upper and lower arch ribs have been changed from the previous intersecting welding form t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 张健康刘召宁胡刚王忠波侯莉莉张秉钧
Owner 中铁宝桥(宝鸡)路桥建设有限公司