Test method for power-receiving start-up with load of offshore wind power project

A technology of offshore wind power and test method, which is applied in the field of offshore wind power generation, can solve the problems that the integrity and correctness of the secondary circuit of the current transformer cannot be guaranteed, there are serious hidden dangers during operation, and the reliable operation of power consumption of the station is affected, so as to achieve perfection The effect of starting the test content by receiving power, improving the quality of debugging, and shortening the trial operation period

Active Publication Date: 2020-03-03
HANGZHOU E ENERGY ELECTRIC POWER TECH +1
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

If the number of installed wind turbines and the submarine cable construction do not meet the conditions for the wind turbine to operate under load, or the current wind force cannot meet the minimum power requirements required for the load test, the time for the load test of the offshore booster station must be postponed, thereby affecting the reliable operation of the station's power consumption , long-term investment in diesel generators is required for construction electricity, which increases the cost
[0006] 2. If the load test is not done before the wind turbine is connected to the grid, the main protection of the tie line protection, the busbar of the offshore booster station, the main transformer and the reactor protection will be out of operation, and the temporary protection single set will run for a long time. The primary equipment will be exposed to In the state of protection configuration and incomplete functions, there are serious hidden dangers during operation
[0007] 3. The integrity and correctness of the secondary circuit of the current transformer cannot be guaranteed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Test method for power-receiving start-up with load of offshore wind power project
  • Test method for power-receiving start-up with load of offshore wind power project
  • Test method for power-receiving start-up with load of offshore wind power project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0039] Such as image 3 The steps of the load test method for offshore wind power project start-up with load are as follows:

[0040]1) After the start of the test, modify the operating status of the AC system and the primary wiring of the wind turbine, and determine the temporary protection, and then preheat the converter through the external power supply, and use the collector line to charge the converter and the booster of the wind turbine; the converter After the wind turbine step-up transformer charging is completed, check whether the status of the converter control system is normal. If the doubly-fed unit needs to be used in the test, the stator should be isolated from the grid.

[0041] 2) If the state of the control system of the converter is normal, switch it to the local control mode, and activate the manual reactive power setting m...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a load test method for the power-driven start-up of an offshore wind power project. At present, how to do a load test during the power-driven start-up of an offshore booster station is a technical problem that is urgently needed to be solved by the technical personnel in the art. When a wind power generating set is in a safe stop state, a unit-side converter is locked, a grid-side converter acts as a reactive power compensator, the reactive power emitted or absorbed by the converters is adjusted according to test requirements. By controlling the power of each converterand the number of invested converters, the amplitude of output current can be flexibly controlled, the requirements of a power-driven start-up test of the offshore booster station are satisfied, and the complete set of calibration of primary equipment, a secondary circuit, a metering instrument and a relay protection and automation equipment can be realized. The power-driven start-up test of the offshore booster station is achieved before the grid-connection of the wind power generating set, the content of the power-driven start-up test of the offshore wind power project is improved, the risksof a later set grid-connected test are reduced, the debugging quality is improved, and the trial run time is shortened.

Description

technical field [0001] The invention relates to the field of offshore wind power generation, in particular to a load test method for an offshore wind power project based on a reactive power compensation operation mode of a converter. Background technique [0002] With the continuous development of new energy technologies, offshore wind power projects are gradually emerging. During the start-up stage of the offshore booster station, according to the requirements of the start-up test of electric power engineering, a complete set of verification of the primary equipment, secondary circuit, metering instruments, relay protection and automation devices is carried out through the load test. The amplitude has certain requirements. [0003] The start-up of the offshore step-up station marked the beginning of part of the trial operation. Both calculation and actual measurement prove that the test available power under the condition of maximum power load is far from meeting the requ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G01R31/34
CPCG01R31/34
Inventor 梁海东王达峰张俊臣汪冬辉孙文文黄军浩方芳贺军金超陈志力何进夏金蝉吴建洪钟玲
Owner HANGZHOU E ENERGY ELECTRIC POWER TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products