A dredging device for sewer gratings used in municipal engineering
A sewer, grid plate technology, applied in water supply devices, cleaning methods using tools, waterway systems, etc., can solve the problems of troublesome cleaning, time-consuming and laborious, unclean and unsanitary, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] A dredging device for sewer gratings used in municipal engineering, such as Figure 1-7 As shown, it includes base 1, roller 2, universal wheel 3, large fixed plate 4, lifting plate 5, first tension spring 6, top plate 7, second tension spring 8, first long connecting plate 9, first fixed Plate 10, first bearing 11, long connecting shaft 12, second bearing 13, second fixed plate 14, second long connecting plate 15, first small rotating disk 16, large rotating disk 17, first fixed rod 18, the first A hook 19, a second fixing rod 20 and a second hook 21, the bottom of the base 1 is connected with a roller 2 and a universal wheel 3, the universal wheel 3 is located on the right side of the roller 2, and the middle position of the top of the base 1 is connected with a large fixed Plate 4, the large fixed plate 4 is provided with a first large chute 401 that runs through front and rear, and the large fixed plate 4 is provided with a second large chute 402 that runs through l...
Embodiment 2
[0031] A dredging device for sewer gratings used in municipal engineering, such as Figure 1-7 As shown, it includes base 1, roller 2, universal wheel 3, large fixed plate 4, lifting plate 5, first tension spring 6, top plate 7, second tension spring 8, first long connecting plate 9, first fixed Plate 10, first bearing 11, long connecting shaft 12, second bearing 13, second fixed plate 14, second long connecting plate 15, first small rotating disk 16, large rotating disk 17, first fixed rod 18, the first A hook 19, a second fixing rod 20 and a second hook 21, the bottom of the base 1 is connected with a roller 2 and a universal wheel 3, the universal wheel 3 is located on the right side of the roller 2, and the middle position of the top of the base 1 is connected with a large fixed Plate 4, the large fixed plate 4 is provided with a first large chute 401 that runs through front and rear, and the large fixed plate 4 is provided with a second large chute 402 that runs through l...
Embodiment 3
[0034] A dredging device for sewer gratings used in municipal engineering, such as Figure 1-7As shown, it includes base 1, roller 2, universal wheel 3, large fixed plate 4, lifting plate 5, first tension spring 6, top plate 7, second tension spring 8, first long connecting plate 9, first fixed Plate 10, first bearing 11, long connecting shaft 12, second bearing 13, second fixed plate 14, second long connecting plate 15, first small rotating disk 16, large rotating disk 17, first fixed rod 18, the first A hook 19, a second fixing rod 20 and a second hook 21, the bottom of the base 1 is connected with a roller 2 and a universal wheel 3, the universal wheel 3 is located on the right side of the roller 2, and the middle position of the top of the base 1 is connected with a large fixed Plate 4, the large fixed plate 4 is provided with a first large chute 401 that runs through front and rear, and the large fixed plate 4 is provided with a second large chute 402 that runs through le...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


