An ecological retaining wall and construction method technology, applied in coastline protection, infrastructure engineering, quay walls, etc., can solve problems such as threatening engineering safety, retaining wall deformation, collapse, etc., and achieve a clear and clear construction process, reduce collisions, and facilitate construction. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] Example 1: Wall 1 is 2m high, the upper surface of wall 1 is 0.5m long, the slope is 60°, C20 concrete, the base is 4m wide, the anti-skid wall toe is 1m front and rear, and the distance between the front anti-skid wall toe and the rear anti-skid wall toe is 1.2 m, the toe height of the anti-skid wall is 0.4m, the length of the anchor pile is 1.6m, the length of the AB section of the base is 1.6m, the length of the CD section is 0.6m, the thickness of the base is 0.2m, and the distance between the left and right anti-skid wall toes is 2m.
Embodiment 2
[0052] Example 2: Wall 1 is 2m high, the upper surface of wall 1 is 0.5m long, the slope is 75°, C35 concrete, the base is 4m wide, the front and rear width of the anti-skid wall toe is 0.8m, the distance between the front anti-skid wall toe and the rear anti-skid wall toe 1.2m, anti-skid wall toe height 0.4m, anchor pile length 1.5m, base section AB length 1.5m, CD section length 0.7m, base thickness 0.4m, left and right anti-skid wall toe distance 1.8m.
Embodiment 3
[0053] Example 3: Wall 1 is 2.5m high, the upper surface of wall 1 is 0.6m long, the slope is 70°, C30 concrete, the base is 4.5m wide, the anti-slip wall toe is 1m front and rear, the front anti-slip wall toe and the rear anti-slip wall toe The distance is 1.3m, the toe height of the anti-skid wall is 0.4m, the length of the anchor pile is 1.8m, the length of the AB section of the base is 2m, the length of the CD section is 0.5m, the thickness of the base is 0.4m, and the distance between the left and right anti-skid wall toes is 1.8m.
[0054] Working principle: Since the present invention solves the bank slope embankment with large water level changes all the year round, the geological structure is relatively soft, so there are strict requirements on the load bearing of the base. The impact caused by the wall, the friction factor of the foundation, the setting of the anchor rod, and the influencing factors are complex and many. In order to solve the above problems, the prese...