Method for constructing bridge and bridge

A technology for bridges and bridge bodies, applied in bridge construction methods and bridge fields, can solve problems such as increased construction cost, adverse social impact, and impact on road traffic or tolls under the bridge.

Active Publication Date: 2018-11-06
GUANGDONG PROVINCE COMM PLANNING & DESIGN INST
View PDF5 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

If the elevation of the bridge cannot be raised due to other factors, the road under the bridge needs to be closed, restricted, height-limited, and speed-limited during the construction process, which seriously affects the passage or toll of the road under the bridge, and also brings adverse social impacts
If steel structure bridges are used instead, the cost will increase significantly

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for constructing bridge and bridge
  • Method for constructing bridge and bridge
  • Method for constructing bridge and bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the associated drawings. Preferred embodiments of the invention are shown in the accompanying drawings. However, the present invention can be embodied in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.

[0022] It should be noted that when an element is referred to as being “fixed” to another element, it can be directly on the other element or there can also be an intervening element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or intervening elements may also be present. In contrast, when an element is referred to as being "directly on" another element, there are no intervening ele...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a method for constructing a bridge and the bridge. The method includes the steps that S100, in preparation of a formwork, a formwork component permanently connected with a concrete-pouring bridge body is made; S200, in hoisting of the formwork, the formwork component is hoisted to the position between two concrete body cantilever segments; S300, in concrete pouring of theformwork, the concrete-pouring bridge body is formed by performing concrete pouring on the formwork component. Firstly, the formwork component which is permanently connected with the concrete-pouringbridge body is prefabricated; hoisting equipment is adopted for hoisting the formwork component to the position between the two concrete body cantilever segments, and concrete pouring treatment is performed on the formwork component; because the formwork component is permanently connected with the concrete-pouring bridge body, the formwork component does not need to be disassembled when the bridgebody is constructed, accordingly, when the bridge crossing existing roads is constructed, the distance between the bottom of the formwork component to the existing roads is the net height of the existing roads at a later period, all operation in the construction is completed in the formwork component, and using influences of construction of the bridge crossing the existing rods on the roads belowthe bridge are reduced; with the formwork component, the structural stress feature of the concrete-pouring bridge body is not changed, and designing difficulty is not increased.

Description

technical field [0001] The invention relates to the technical field of bridge construction, in particular to a bridge construction method and a bridge. Background technique [0002] With the rapid development of traffic in recent years, the density of my country's road network has continued to increase. There are more and more intersections between newly built roads and existing roads. There are more and more bridges spanning existing roads, and the span requirements are also increasing. Therefore, Prestressed concrete continuous box girder with variable section or equal section is mostly used. In order to reduce the impact on the traffic under the bridge, the construction plan mostly adopts hanging baskets to cast. However, during the construction of the hanging basket, the temporary headroom for construction needs to be more than 1.2m; the elevation of the upper-span bridge has to be increased during the design, and the scale of the bridge needs to be increased accordingly...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D101/24
CPCE01D21/00E01D2101/24E01D2101/26
Inventor 万志勇梁立农徐德志杜磊官快罗旭东
Owner GUANGDONG PROVINCE COMM PLANNING & DESIGN INST