A continuous drag-and-drag track-laying construction technology for 25-meter standard rail
A construction technique and drag-and-drop technology, which can be applied to tracks, track laying, track maintenance, etc., can solve the problems of large mechanical investment, high mechanical transfer cost, low efficiency of manual track laying, etc., so as to reduce mechanical investment and improve construction efficiency. , Save the effect of track laying base construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0024] The embodiment of the present invention provides a continuous drag-and-drag track-laying construction process for a 25-meter standard rail. After the sleeper, ballast transport paving, cloth pillow, and sulfur anchorage are completed, the rail dragging construction operation is carried out; the operation process is as follows: Figure 1-3 As shown, rail material unloading→laying rollers→horizontal slide rail bracket installation and towing rail preparation→rail towing construction→removal of rollers and horizontal slide rail brackets→fastener installation→rail unloading and rail connection si...