Foundation pit top horizontal displacement monitoring method based on opposite side distance measurement
A technology of horizontal displacement and foundation pit, which is applied in the testing of basic structures, basic structure engineering, construction, etc., and can solve problems such as affecting the coordinate observation values of monitoring points.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0059] like figure 1 As shown in the figure, a method for monitoring the horizontal displacement of the top of a foundation pit based on side-to-side ranging includes the following steps:
[0060] S1, C1, C2 are any two known reference points, P is a free station, install a total station at point P, and observe the slope distance S from point P to the reference points C1, C2 with the necessary accuracy c1 , S C2 and the included angle¶ 1 , and the zenith distance V from point P to reference points C1 and C2 C1 , V C2 , through the adjustment calculation, the coordinates of the P point (x p ,y p ):
[0061]
[0062]
[0063] in:
[0064]
[0065] S2, freely set up site P and install a total station. After observing the two reference points, then observe the foundation pit monitoring point W1, or observe the total station to the reference points C1, C2 and monitoring point W1 with equal accuracy. Tilt distance, zenith distance, and horizontal plate readings, S...
Embodiment 2
[0098] like image 3 As shown, it is the distribution map of horizontal displacement monitoring points at the top of a foundation pit in Jinan. The shape of the foundation pit is as follows image 3 As shown, the monitoring method is the same as that in Example 1, except that the monitoring point W1 in Example 1 is replaced by W01, W02, W03...W08 in the foundation pit, and the monitoring data of 8 points are obtained, as shown in the table 1 shows the monitoring daily report of a certain day, the same foundation pit is monitored by the conventional polar coordinate method to obtain the data in Table 2;
[0099] Table 1: Daily monitoring report of horizontal displacement of foundation pit slope top (distance convergence method)
[0100]
[0101]Table 2: Daily monitoring report of horizontal displacement of foundation pit slope top (polar coordinate method)
[0102]
[0103]
[0104] The distance convergence method proposed by the present invention is used to monitor ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com