[0018] In order to have a further understanding and understanding of the structural features of the present invention and the achieved effects, the preferred embodiments and accompanying drawings are used for a detailed description, as follows:
[0019] Such as figure 1 As described, a method for connecting the superelevation section with a large cross-section along the trough includes the following steps:
[0020] First lay three rows of anchor cables 1 along the center line of the trough and both sides of the center line. The distance between the anchor cables 1 on both sides and the center line and the side is the same, and the exposed length of the anchor cables 1 is set according to the height of the trough. Put the I-beam 2 with eyelets across multiple rows of anchor cables 1 along the width direction of the groove, the end of the anchor cable 1 passes through the eyeholes on the I-beam 2, and use the rope clamp 3 to limit the I-beam 2 On the anchor cable 1, the I-beam ...