Combined Excavation Method of Layered Stairs for Deep Foundation Pit in Wide Shallow Valley and Deep Foundation Pit with Thick Covering Layer of Sand and Pebble

A technology of sand, pebbles and covering layers, which is applied in the field of civil engineering, can solve the problems of immaturity, and less research on the construction technology of rapid drainage of water inside the foundation pit, and achieve the effects of reducing impact, improving drainage effect, and convenient flushing and utilization

Active Publication Date: 2020-06-02
CCFEB CIVIL ENG
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the deep foundation pit construction technology carried out by engineering circles under the geological conditions of thick sandy pebbles and weakly weathered siltstone has achieved good engineering construction results under suitable working conditions, but how to systematically strengthen the division and block, There are few researches on construction techniques such as rapid drainage of water inside the foundation pit and directional micro-blasting, especially in terms of systematically considering the connection between various construction techniques, reducing the impact of blasting construction on foundation pits and cofferdams, and quickly closing the excavation surface of foundation pits. technology is not yet mature

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Combined Excavation Method of Layered Stairs for Deep Foundation Pit in Wide Shallow Valley and Deep Foundation Pit with Thick Covering Layer of Sand and Pebble
  • Combined Excavation Method of Layered Stairs for Deep Foundation Pit in Wide Shallow Valley and Deep Foundation Pit with Thick Covering Layer of Sand and Pebble
  • Combined Excavation Method of Layered Stairs for Deep Foundation Pit in Wide Shallow Valley and Deep Foundation Pit with Thick Covering Layer of Sand and Pebble

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] The technical requirements for excavation of sand and pebble layers, the technical requirements for rock blasting construction, the technical requirements for drainage trench excavation, the technical requirements for the design and production of concrete road slabs, the technical requirements for the production and construction of downwater pipes, the technical requirements for the construction of water collection wells, and the on-site Technical requirements for welding construction, concrete mix ratio design, and technical requirements for pouring construction, etc., will not be described in detail in this embodiment, and the embodiment of the structure related to the present invention will be focused on.

[0043] figure 1 It is a construction flow chart of the combined excavation method for layered steps of a deep foundation pit with a thick covering layer of sand and pebbles in a wide, shallow valley and deep foundation pit. figure 1 As shown, a method for combined...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a deep foundation pit layered ladder section combined excavation method of a wide shallow river valley with a sand gravel thickness coverage layer. The method is characterizedin that a drainage ditch, a water collecting well and a water precipitation well are arranged at an inner part of a foundation pit before a sand gravel layer is excavated, and an elevation adjustingbody and an energy dissipation groove are arranged at a joint of the drainage ditch and the water collecting well; layered thickness and a partition position of the sand gravel layer are determined firstly, then layered partition excavation is carried out, and then a mortar protective layer is sprayed on a slope surface; layered loose blasting is sprayed on a rock stratum from top to bottom, and pre-crack blasting is adopted on the side slope part, a blasting working groove is arranged inside the protective layer, a horizontal main blasting hole and a horizontal auxiliary blasting hole are synchronously drilled, and then smooth blasting is carried out; a concrete cushion layer is immediately applied after the rock stratum is excavated; and finally a transverse reinforcement body, a transverse drainage body and a plain concrete layer are arranged on the slope of the foundation pit. According to the method, the cost of drainage of the foundation pit and a construction channel can be saved. the field construction efficiency and quality can be improved as well, and the influence on the surrounding environment can be further reduced.

Description

technical field [0001] The present invention relates to a large-scale deep foundation pit excavation construction method, in particular to a layered step combination excavation construction of a large deep foundation pit with a thick covering layer of sand and pebbles on the upper part and a thick covering layer of sand and pebbles on the lower part of a shallow river valley. The method belongs to the field of civil engineering and is suitable for large-scale deep foundation pit excavation projects with large foundation pit depth and complex geological conditions. Background technique [0002] For the construction of large-scale deep foundation pits in rainy areas, it is often necessary to take various measures to improve the stability of the foundation pit, such as rationally setting the foundation pit slope support structure, dewatering the engineering foundation pit according to local conditions, and adjusting the slope ratio of the foundation pit, etc. The implementation...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D17/02E03F3/04E01C5/08E02D19/06E02D19/10E02D19/08E02D19/04E02D17/04