Device for preventing bridge abutment deviation and sand leakage and implementation method thereof
A bridge abutment and sand leakage technology, which is applied in the fields of geotechnical engineering, bridge engineering, and highway traffic engineering, can solve the problems of biased actual engineering guidance and insufficient test accuracy in test conclusions.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0047] An implementation method of the above-mentioned device for preventing abutment offset and sand leakage, which includes the following steps:
[0048] a. Weld horizontal steel plates on both side walls of the steel box, so that one vertical edge of the horizontal steel plate is closely attached to the side wall of the steel box, and an opening is formed between the horizontal steel plates on both sides;
[0049] b. The side of the transverse steel plate that is not welded to the steel box is respectively welded with a longitudinal steel plate, so that the longitudinal steel plate and the transverse steel plate are seamlessly and closely connected;
[0050] c. Fix a layer of thick tetrafluoroethylene board on the inner surface of the two longitudinal steel plates;
[0051] d. Weld a supporting channel steel on both sides of the center line at the bottom of the longitudinal steel plate;
[0052] e. A horizontal steel plate is installed below the two longitudinal steel plat...