Main tower column construction process

A technology of construction technology and main tower, applied in construction, bridge construction, bridges, etc., can solve the problems of low construction work efficiency, consumption of materials and labor, narrow operation space, etc., to achieve the effect of ample operation space and improvement of construction efficiency

Inactive Publication Date: 2019-03-15
CCCC THIRD HARBOR ENG
View PDF4 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The installation of temporary steel brackets not only consumes materials and labor, but also belongs to high-altitude operations, which is highly dangerous
[0005] Conventional bellows positioning uses well-shaped steel bars to transfer the weight of bellows and steel strands to the steel frame. This process requires that the steel bar frame be installed before the bellows can be positioned. Only the well-shaped steel bars have a force point. For the wall The tower column is only one meter thick. The bellows positioning operator needs to enter the interior of the steel skeleton to work. The operating space is very narrow and the construction efficiency is extremely low.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Main tower column construction process
  • Main tower column construction process
  • Main tower column construction process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0033] A kind of main tower column construction technology among the present invention, comprises the following steps: Main tower column is divided into two construction sections from bottom to top, and described construction section comprises the first construction section at the bottom and the first construction section at the first construction section. The second construction section above;

[0034] The first construction section carries out tower column construction by erecting supports;

[0035] The second construction section carries out the tower column construction by erecting a stiff framework, and the stiff framework forms the overall steel structure of the second construction section of the tower column, and the surrounding sides of the stiff framework are composed of several interconnected steel bars Composition, the inner side of the rigid skeleton is provided with an installation space for steel strands;

[0036] Hydraulic climbing formwork and formwork reinfor...

Embodiment 2

[0053] In this embodiment, it is necessary to mechanically construct the main tower column of the Zhaohua Bridge. The main tower column of the Zhaohua Bridge adopts a large curved lotus shape with an outer curve radius of 325m and an inner curve radius of 270m and 300m, with a height of 100.8m. 23 construction sections, the standard section height is 4.5m, the concrete grade is C55, and it is a large-volume concrete project. The construction time spans winter, and the concrete crack control construction is difficult; Different curve designs greatly increase the difficulty of climbing formwork construction; vertical prestressed steel strands are installed inside the tower column, with a maximum length of 52.54m and a heaviest weight of about 6t.

[0054] The first phase of the G320 Xiangtan Ring Road Project is located in Xiangtan City, Hunan Province. It is a key project in Hunan Province. It has a total length of 5.1km and is divided into three contract sections. The first and...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a main tower column construction process. The process comprises the following steps that a main tower column is divided from bottom to top into two construction sections, and the construction sections comprise a first construction section at the bottom and a second construction section above the first construction section; the first construction section conducts tower column construction by erecting a frame; the second construction section conducts tower column construction by erecting a stiff skeleton, the stiff skeleton constitutes an overall reinforcing bar structureof the second construction section of the tower column, the circumferential side of the stiff skeleton is composed of a plurality of interconnected reinforcing bars, and the inner side of the stiff skeleton is provided with steel strand installation space; a hydraulic climbing mold and formworks are reinforced, a plurality of the inner and outer formworks are arranged along the outside of the stiff skeleton, the inner and outer formworks are fixed by bolts, and a casting cavity is formed between the outer formwork and the stiff skeleton; a concrete is poured, and the concrete is poured between the inner and outer formworks to form a thin-walled tower column. The above process is adopted, the construction is convenient, the positioning is easy to operate, and a temporary steel frame is notrequired to be installed.

Description

technical field [0001] The invention mainly relates to the technical field of tower column construction, in particular to a main tower column construction process. Background technique [0002] The main tower column of Zhaohua Bridge adopts a large curved lotus shape consisting of an outer curve radius of 325m and an inner curve radius of 270m and 300m. And it is a large-volume concrete project, the construction time spans winter, and the concrete crack control construction is very difficult; the construction of the tower column adopts hydraulic climbing formwork construction technology, and because the overall tower column is curved, the difficulty of climbing formwork construction is greatly increased; Vertical prestressed steel strands, the longest single strand is 52.54m, and the heaviest is about 6t. [0003] For tower column construction, it is necessary to make the vertical steel strands basically vertical before construction can be carried out. Due to the large leng...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D19/14
CPCE01D19/14E01D21/00
Inventor 李业勋汪涛项勇韩立勤姜荣华莫亚思
Owner CCCC THIRD HARBOR ENG