Cost assessment method based on power grid typical cost data
A typical cost-effective technology, used in data processing applications, marketing, instruments, etc., can solve problems such as low accuracy and stability, and achieve the effect of improving efficiency and cost level and saving time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The technical solution of the present invention will be specifically described below in conjunction with the accompanying drawings.
[0022] The present invention provides a method for cost assessment based on typical grid cost data, including the following steps:
[0023] Step S1, select the project cost data of power grid project estimation, estimation, budget, and settlement, save them in the relational database, and classify them according to the project voltage level and project type, and form the big data of typical electric power project cost for calculation and analysis;
[0024] Step S2, obtaining the technical parameters and project overview of typical cost projects from the original power grid project;
[0025] Step S3, according to the technical parameters and project overview in step S2, quickly match the qualified projects to participate in the calculation from the big data of typical electric power cost projects. The matching method is to select the Cons...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com