Continuous construction method of floor system
A construction method and floor covering technology, applied to floors, building components, buildings, etc., can solve the problems of long construction period, large formwork occupation, and long turnover period, and achieve the goals of shortening construction period, improving turnover efficiency, and reducing occupation time Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Embodiment 1: as attached Figure 1~2 As shown, a continuous construction method of the floor. During the construction of the floor, a force transmission device 1 is embedded in the floor, and the force transmission device 1 is temporarily connected to the support 2 between the upper and lower adjacent floors. , so that the load acting on the upper support 2 can be transferred to the lower support 2 through the force transmission device 1 .
[0039] Force transmission device 1, its shape is as Figure 5 As shown, it can be mass-produced in the factory, and can be made of steel bars, or steel pipes, or section steel.
[0040] Concrete prefabricated cylindrical rib 4, its shape is as Figure 7 As shown, mass produced at the factory.
[0041] Concrete prefabricated mold box 6, its shape is as Figure 7 As shown, mass produced at the factory.
[0042] Concrete prefabricated slab 3, its shape is as Image 6 As shown, mass produced at the factory.
[0043] A kind of fl...
Embodiment 2
[0060] Embodiment 2: A kind of continuous construction method of floor, bottom template 5 adopts aluminum mold to reuse, and carries out according to the following steps:
[0061] 1) Install support 2 according to the determined position.
[0062] 2) Every three adjacent supports 2 are connected as a triangular horizontal support.
[0063] 3) Install the force transmission device 1 on the top surface of the support.
[0064] 4) Repeat the previous three steps on the top surface of the force transmission device 1.
[0065] 5) While performing step 4, install the formwork 5 at the bottom of the floor and connect it to the side or bottom of the support 2.
[0066] 6) Install prefabricated components, steel bars and laminated concrete pouring on all floors where support 2 has been installed.
[0067] 7) When the laminated concrete reaches the form removal strength, remove the formwork 5 at the bottom of the floor.
[0068] 8) When the concrete strength of the floor reaches the...
Embodiment 3
[0069] Embodiment 3: A kind of continuous construction method of floor, bottom template 5 adopts prefabricated concrete member, carries out according to the following steps:
[0070] 1) Install support 2 according to the determined position.
[0071] 2) Every three adjacent supports 2 are connected as a triangular horizontal support.
[0072] 3) Install the force transmission device 1 on the top surface of the support.
[0073] 4) Repeat the previous three steps on the top surface of the force transmission device 1.
[0074] 5) While performing step 4, install the formwork 5 at the bottom of the floor and connect it to the side or bottom of the support 2.
[0075] 6) Install prefabricated components, steel bars and laminated concrete pouring on all floors where support 2 has been installed.
[0076] 7) When the concrete strength of the floor reaches the strength requirement, remove the support 2 of each floor from bottom to top.