Hydraulics determination method for utilization range and flood control safety position of compound beach land of mountain river
A technology of safe location and beach land, applied in river regulation and other directions, can solve problems such as reduction of water passing area, lack of scientific basis, and flooding of rivers and buildings inundation disasters.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] In this embodiment, the method for hydraulically determining the utilization range of compound flats in mountainous rivers and the safe location for flood control provided by the present invention will be described in detail.
[0055] Longxi River is a primary tributary of the upper reaches of the Minjiang River in Dujiangyan City, with a total length of 18.22km and a drainage area of 79km 2 . A section of the lower reaches of the Longxi River was affected by incoming sand from the upper reaches and widening of the channel, forming a wide beach on both sides of the main channel of the river. Due to the need for intensive resettlement of residents in the Wenchuan Earthquake, residential houses were built on the left beach, such as figure 2 as shown, figure 2 It is a photo of the target river section on May 26, 2014 (sourced from Google Earth). However, due to continuous heavy rainfall on August 13, 2010, heavy rain and mountain torrents occurred in the earthquake-s...
Embodiment 2
[0083] In this embodiment, the method for hydraulically determining the utilization range of compound flats in mountainous rivers and the safe location for flood control provided by the present invention will be described in detail.
[0084] Guanshan River is a tributary of the Han River, with a total length of 163km and a drainage area of 880km 2 . A section of the middle reaches of the Guanshan River is constrained by bends and widening and narrowing, forming a large beach on the right bank of the river, which is the main agricultural land in the area, such as Figure 5 as shown, Figure 5 It is a photo of the target river section on January 20, 2017 (sourced from Google Earth). On August 6, 2012, affected by heavy rain and flood, the peak flow of Guanshan River reached 2410m 3 / s, leading to the destruction of all good fields in the beach, and the water depth of the beach is about 3m. In the post-disaster reconstruction that began in 2013, the right embankment of the r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com