Self-balancing support structure and method of pipe screen working well
A technology for supporting structures and working wells, applied to underwater structures, infrastructure engineering, artificial islands, etc., can solve problems such as increasing construction difficulty, affecting construction progress, and occupying working space of working wells, so as to improve stability and The effects of firmness, saving investment and improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0036] refer to figure 1 , the present invention provides a self-balancing support structure and method for a pipe-curtain working well, which solves the problem that the support system used to resist the water and soil pressure outside the side wall occupies the working space of the working well and occupies the subsequent roof when supporting the existing working well. Pipeline and reinforcement of the construction work surface will affect the construction progress, increase the difficulty of construction and increase the construction cost. In the self-balancing support structure and method of the pipe curtain working well of the present invention, the end of the pipe curtain and the side wall of the working well are connected into one body by force transmission parts to form an integral force-bearing structure, so that the water and soil pre...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


