A front-end processor real-time missed compensation method and system based on task slots

A front-end computer, task slot technology, applied in data processing applications, instruments, computing, etc., can solve the problems of low efficiency of leak auditing and low collection success rate, and achieve the effect of improving collection success rate and improving timeliness

Inactive Publication Date: 2019-06-14
杭州海兴泽科信息技术有限公司 +3
View PDF6 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This method will only audit and count data leaks in certain time periods, and then make up for recruitment. This will lead to low audit efficiency of leaks, and data leaks will always exist in several collection cycles, resulting in successful collection. rate is not high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A front-end processor real-time missed compensation method and system based on task slots
  • A front-end processor real-time missed compensation method and system based on task slots
  • A front-end processor real-time missed compensation method and system based on task slots

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0034] Such as figure 1 As shown, a real-time leak compensation method for front-end processors based on task slots includes the following steps:

[0035] S100: Configuring the task model of the meter, and initiating a recruitment task;

[0036] S200: Read the data schedule in the task model;

[0037] S300: Analyzing the progress time in the data progress table;

[0038] S400: reference time and acquisition cycle time in the sampling task model;

[0039] S500: comparing the progress time with the reference time;

[0040] S600: If the difference is greater than the cycle time, initiate a supplementary recruiting task, take the progress time as the start time, and take the reference time as the end time, and collect the meter data between the two times;

[0041] S700: If the difference is less than the cycle time, collect data from the current meter according to the task model, and after the collection is successful, update the data schedule, and use the task end time of the...

Embodiment 2

[0061] Such as image 3As shown, a real-time leakage compensation system for front-end processors based on task slots includes a configuration module 1, a reading module 2, an analysis module 3, a sampling module 4, a leakage compensation module 5, and a jump point module 6. The configuration module 1 is used for It is used to configure the task model of the meter and initiate a round-robin task; the reading module 2 is used to read the data schedule in the task model; the analysis module 3 is used to analyze the progress time in the data schedule; the sampling module 4 is used for the sampling task The reference time and acquisition cycle time in the model; the leak supplementary recruitment module 5 is used to compare the progress time with the reference time, if the difference is greater than the cycle time, a supplementary recruitment task will be initiated, with the progress time as the starting time and the reference time As the end time, collect the meter data within th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a front-end processor real-time missed compensation method and system based on a task slot. The method comprises the steps of configuring a task model of the meter, and initiating a round call task; reading a data schedule in the task model; analyzing the progress time in the data progress table; sampling reference time and acquisition period time in the task model; comparing the progress time with the reference time, if the difference value is greater than the period time, initiating a call supplementing task, and collecting meter data in the two times by taking the progress time as the starting time and the reference time as the ending time; and if the difference value is smaller than the period time, performing data acquisition on the current meter according to the task model, updating the data progress table after the acquisition is successful, and taking the task ending time of the task as the progress time in the data progress table. According to the present invention, the collection is carried out according to the collection progress time point, and if a leakage point exists between the collection progress time point and the current time point, the leakage point can be copied back, so that the calling supplementing timeliness is improved.

Description

technical field [0001] The invention relates to the technical field of meter reading, in particular to a task slot-based real-time leakage compensation method and system for a front-end computer. Background technique [0002] The acquisition success rate is an important index reflecting the acquisition quality in the power acquisition system. At present, most of the collection systems have phenomena such as untimely data supplementation and low efficiency, which eventually lead to a low success rate of power system collection and affect the user's system experience. [0003] At present, the supplementary recruitment of most power collection systems adopts the following method: regularly count which meters have leaks in certain time periods of the day, and then initiate supplementary recruitment. This method will only audit and count data leaks in certain time periods, and then make up for recruitment. This will lead to low audit efficiency of leaks, and data leaks will alwa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/06
Inventor 汪扬周良璋张向程姚青
Owner 杭州海兴泽科信息技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products