Construction method of horizontal pipe of buried-pipe ground source heat pump based on pond residue stratum
A technology for ground source heat pumps and horizontal pipes, which is applied in the direction of pipes/pipe joints/fittings, pipe laying and maintenance, mechanical equipment, etc. Problems such as construction quality and economic constraints, to achieve the effect of preventing ground subsidence and protecting safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0011] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
[0012] Such as Figure 1 ~ Figure 3 As shown, a horizontal pipe construction method of buried pipe ground source heat pump based on the pond dregs stratum, according to the design requirements of the outdoor ground, the design relative elevation of the outdoor ground is -0.4m, the relative elevation of the current ground is -1.2m, and the thickness of the pond dregs layer is About 2.6m, the bottom elevation of the pond dregs is -3.8m, the design buried depth of the horizontal pipe is 2m below the ground, and the elevation of the center of the horizontal pipe is -2.4m. When the buried pipe is constructed, a large area of the pond dregs layer with a depth of 1.2m is firstly carried out Excavation, that is, excavation at the center elevation of the horizontal pipe, the horizontal pipe includes a horizontal...