Unlock instant, AI-driven research and patent intelligence for your innovation.

Identity management and control method and device for construction site operators

A technology for operators and construction sites, applied in the field of identification, can solve problems such as management difficulties, safety hazards, illegal operations, etc., and achieve the effect of ensuring safety, safe and reliable control

Pending Publication Date: 2019-08-09
GUANGDONG POWER GRID CO LTD +1
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, multiple projects start construction at the same time from time to time, which leads to high mobility of operators on the construction site, and it is very difficult to manage. There are often unlicensed reckless operations, illegal operations, impostors, and failure to wear construction certificates in accordance with regulations. And other difficult problems have buried certain hidden dangers to the construction site.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Identity management and control method and device for construction site operators
  • Identity management and control method and device for construction site operators

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0045] Please refer to the attached figure 1 , is a schematic flowchart of a method for managing and controlling the identity of construction site workers provided in Embodiment 1 of the present invention, and the method is executed by an identity control device for construction site workers. The method specifically includes the following steps:

[0046] S101. Receive an identity confirmation request.

[0047] S102. Collect the biometric information of the worker according to the preset collection rules, and determine whether the worker is a compliant worker from the preset feature database; if yes, execute S104; if not, execute S103.

[0048] S103. Send out an alarm prompt to dismiss the operator from the construction site.

[0049] S104. Query whether the historical record of deduction points of the operator exceeds the total amount of deduction points; if yes, execute S105; if not, execute S106.

[0050] S105. Send out an alarm prompt to dismiss the operator from the con...

Embodiment 2

[0066] Embodiment 2. Embodiment 2 of the present invention provides an identity management and control device for construction site workers. The device specifically includes:

[0067] Request receiving module 21, configured to receive an identity confirmation request;

[0068] The identity confirmation module 22 is used to collect the biometric information of the operator according to the preset collection rules, and determine whether the operator is a compliant operator from the preset feature database;

[0069] Point deduction query module 23, for if the operator is a compliant operator, then inquire whether the historical record of deduction points of the operator exceeds the total amount of points deducted; alert prompt;

[0070] Random examination module 24, used for if the record of deduction points for violations of the operator does not exceed the total amount of deduction points, then call out the safe operation rule question bank to carry out random examination for ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an identity control method and device for construction site operators, and the method comprises the steps: collecting the biological characteristic information of the operatorsaccording to a preset collection rule, and determining whether the operator is a compliant operator or not; if the operator is a compliant operator, inquiring whether the score deduction historical record of the operator exceeds the score deduction total amount or not; if the violation score deduction record of the operator does not exceed the total score deduction amount, calling out a safety operation rule question bank to randomly exam the operator; if the operator is not a compliant operator, sending out an alarm prompt for dismissing the operator from the construction site; if the sampling test result of the operator is qualified, releasing the operator; and if not, deducting score of the operator. According to the identity management and control method and device for the construction site operation personnel, whether the operation personnel are compliant operation personnel on the construction site or not can be effectively identified, so that the operation personnel can be managed and controlled more safely and reliably, and the safety of the construction site is ensured.

Description

technical field [0001] The embodiments of the present invention relate to the technical field of identification, and in particular, to a method and device for managing and controlling the identity of workers at a construction site. Background technique [0002] At present, multiple projects start construction at the same time from time to time, which leads to high mobility of operators on the construction site, and it is very difficult to manage. There are often unlicensed reckless operations, illegal operations, impostors, and failure to wear construction certificates in accordance with regulations. And other difficult problems have buried certain hidden dangers to the construction site. Contents of the invention [0003] The invention provides a method and device for managing and controlling the identity of workers on a construction site to solve the deficiencies in the prior art. [0004] To achieve the above object, the present invention provides the following technic...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06K9/00G06Q10/06G06Q50/08
CPCG06Q10/06398G06Q50/08G06V20/52G06V40/70
Inventor 黄科李子龙李志华叶嘉铮
Owner GUANGDONG POWER GRID CO LTD