A pre-buried channel assembly for pipe gallery construction
A technology of pre-embedded channels and pipe galleries, applied in the directions of buildings, building structures, artificial islands, etc., can solve the problems of inconvenient installation and inconvenient adjustment of clamping distance, and achieve the effect of reducing friction and increasing load strength.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0021] see Figure 1-4 , a pre-embedded channel assembly for pipe gallery construction, including a horizontal plate 1, the lower surface of the horizontal plate 1 includes a pre-embedded column 2, the top of the pre-embedded column 2 is welded to the lower surface of the horizontal plate 1, and the embedded column 2 The bottom end includes a reinforcement rod 3, the upper surface of the reinforcement rod 3 is welded to the bottom end of the embedded column 2,...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


