Unlock instant, AI-driven research and patent intelligence for your innovation.

Channel improvement project dynamic management information system and method

A dynamic management and information system technology, applied in office automation, data processing applications, instruments, etc., can solve problems such as difficult engineering data, low work efficiency, and high manpower and material resources

Pending Publication Date: 2019-08-30
SHANGHAI WATERWAY ENG DESIGN & CONSULTING
View PDF2 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The current dynamic management of waterway improvement projects, the submission and approval of most of the materials are still using traditional methods such as paper, CD-ROM, and mail. The work efficiency is low and it is difficult to effectively control and timely share a large amount of engineering data. There is a problem of untimely communication and transmission lag
Because there is no corresponding information system management, the collection, query and distribution of data often consume a lot of manpower and material resources. It is difficult for relevant participating units to grasp the latest progress and dynamics of the project in a timely manner, and it is difficult to carry out dynamic management work.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Channel improvement project dynamic management information system and method
  • Channel improvement project dynamic management information system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0031] figure 1 It is the overall network structure diagram of the system of the present invention. figure 2 It is a main functional frame diagram of the system of the present invention.

[0032] Such as figure 1 with figure 2 As shown in the figure, a dynamic management information system for waterway improvement project includes modules such as engineering information release management, GIS basic data management, engineering results management, information interaction and collaborative management, and system management.

[0033] The system is designed based on B / S architecture, including application server, GIS map publishing server, database and file server. Read all kinds of engineering data that are authorized to be accessed. The user categories include engineering construction management units, survey units, scientific research units, design units, construction units, supervision units, system administrators and log auditors. Different types of users are responsibl...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a channel improvement project dynamic management information system and method. The channel improvement project dynamic management information system comprises a project information release management module, a GIS basic data management module, a project achievement management module, an information interaction cooperative management module and a system management module. Compared with the prior art, for the channel improvement project dynamic management information system and method, by combining dynamic management of the channel improvement project with the Web and the GIS, a basic information management system is constructed, and the problems that information inquiry is difficult, communication is not timely and joining is difficult due to the fact that the number of data and versions of an existing channel improvement project are large are solved, and an effective channel is provided for timely issuing of abnormal conditions of the project, and technical support is provided for rapid response of a project constructor and a decision-making party.

Description

technical field [0001] The invention relates to the field of waterway regulation engineering management, in particular to a dynamic management information system and method for waterway regulation projects. Background technique [0002] The concept and practice of dynamic management of large waterway regulation projects began in the middle of the 19th century. The dynamic management of domestic waterway improvement projects began after the 1980s. With the successive implementation of large-scale ports and waterway projects such as Tianjin Port, Yangtze River Estuary, and Pearl River Estuary, the concept of dynamic management has gradually been established, and has gradually become the guiding principle for engineering design and construction. important mechanism. [0003] The current dynamic management of waterway improvement projects, the submission and approval of most of the materials are still using traditional methods such as paper, CD-ROM, and mail. The work efficienc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08
Inventor 徐元刘小喜龚鸿锋史坦晶万新宁
Owner SHANGHAI WATERWAY ENG DESIGN & CONSULTING