An installation and construction method for an upper beam of a double-layer synchronous beam
A beam-on-beam, construction method technology, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of U-shaped beams that cannot be hoisted and intruding into the hoisting space.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] Embodiment 1: A method of installation and construction of a double-layer synchronous girder upper frame. The main structure includes a large cover beam for placing a box girder and a middle beam for placing a U-shaped beam. The cross section of the main structure is Y-shaped, and the length of the large cover beam exceeds the middle beam. beam length. A bridge erecting machine and a truck crane are required for hoisting. The truck crane includes 500t truck crane, 400t truck crane, 300t truck crane, 220t truck crane, and 300t crawler crane. Among them, 500t truck crane, 400t truck crane and 300t crawler crane are used for lifting. 300t truck crane, 220t truck crane for installation. U-shaped girders, small box girders or steel laminated girders in this project are hoisted by 280t bridge erecting machine, among which U-shaped girders and small box girders are prefabricated girders. Due to the heavy weight and large section of the U-shaped beam, it is strictly forbidden ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com