Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Gas-electric coupling comprehensive energy system planning method considering elastic scheduling strategy

An integrated energy system and dispatch strategy technology, which is applied in the field of gas-electric coupling integrated energy system planning considering flexible dispatch strategies, can solve the problem of affecting the production and living energy of the system, and can not meet the energy demand of important loads when the source end fails. Load shedding, etc.

Active Publication Date: 2019-09-20
TIANJIN UNIV +1
View PDF11 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In addition, energy supply failures often occur in gas-electricity coupled integrated energy systems, resulting in load shedding, which seriously affects the normal production and domestic energy consumption of the system; establish a dispatch strategy that can adapt to source-side failures, and develop strategies that can meet the requirements of actual operation. The planning and design method of source-side fault adaptability requirements is of great significance
[0004] At present, the planning and design of gas-electricity coupled integrated energy systems mostly ignore the impact of supply failure at the source end, and carry out economic planning that considers investment costs and operating costs. The resulting planning and design scheme cannot meet the energy demand of important loads when the source end fails.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Gas-electric coupling comprehensive energy system planning method considering elastic scheduling strategy
  • Gas-electric coupling comprehensive energy system planning method considering elastic scheduling strategy
  • Gas-electric coupling comprehensive energy system planning method considering elastic scheduling strategy

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The gas-electric coupling comprehensive energy system planning method considering the flexible scheduling strategy of the present invention will be described in detail below with reference to the embodiments and the accompanying drawings.

[0040] The gas-electricity coupling integrated energy system planning method considering the flexible scheduling strategy of the present invention is aimed at the planning problem of the gas-electricity coupled integrated energy system, comprehensively considering various constraints, and through the coupling calculation of the optimal design model and the elastic scheduling model, Finalize the design plan.

[0041] Such as figure 1 As shown, the gas-electric coupling comprehensive energy system planning method of the present invention considering the flexible scheduling strategy includes the following steps:

[0042] 1) According to the gas-electricity coupling comprehensive energy system structure, input electricity price and gas ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a gas-electric coupling comprehensive energy system planning method considering an elastic scheduling strategy. The method comprises the following steps: inputting the structure and equipment parameters of a gas-electric coupling comprehensive energy system according to the structure of the gas-electric coupling comprehensive energy system; establishing gas-electric coupling comprehensive energy system equipment operation constraints of the cooling typical day and the heating typical day; establishing a multi-stage optimization scheduling model oriented to elastic operation; establishing an optimization model based on a genetic algorithm; and carrying out interactive solution on the optimal configuration layer multi-stage optimal scheduling model and the operation optimization layer optimization model and outputting a solution result, wherein the solution result comprises an equipment configuration scheme and an optimal scheduling plan. According to the invention, the complementary coordination effect of the electric drive equipment and the gas drive equipment and the response capability of the energy storage device are fully considered; and a gas-electric coupling comprehensive energy system double-layer planning and design model considering an elastic scheduling strategy is established, the upper layer is evolved and optimized by adopting a genetic algorithm, and a related mathematical solver is called for solving the lower layer to obtain a system planning and design scheme and an optimal scheduling planGas-gas scheduling strategy considering elastic scheduling strategy Electrical coupling comprehensive energy system planning method: gas-gas coupling comprehensive energy system planning is carried out according to gas-gas Electrical coupling integrated energy system structure and input gas- The structure and equipment parameters of the comprehensive energy system are electrically coupled; establishment of gas-heating typical day and cooling typical day Equipment operation constraint of the integrated energy system is electrically coupled; establishing a multi-stage optimization scheduling model oriented to elastic operation; establishing an optimization model based on a genetic algorithm; and carrying out interactive solution on the multi-stage optimization scheduling model of the optimization configuration layer and the optimization model of the operation optimization layer, and outputting a solution result which comprises an equipment configuration scheme and an optimal scheduling plan. Complementary coordination effect of electric driving equipment and gas driving equipment and response capability of an energy storage device are fully considered, and a gas-gas scheduling strategy considering an elastic scheduling strategy is established; and a double-layer planning design model of the integrated energy system is electrically coupled, an upper layer adopts a genetic algorithm to evolve and optimize, a lower layer calls a related mathematical solver to solve, and a system planning design scheme and an optimal scheduling plan are obtained.

Description

technical field [0001] The invention relates to a comprehensive energy system planning method. In particular, it involves a gas-electricity coupling integrated energy system planning method considering flexible scheduling strategies. Background technique [0002] Energy and environmental issues have become the focus of attention of all countries in the world. The development and utilization of renewable energy and the improvement of energy utilization efficiency are the inevitable choices for achieving sustainable development and clean energy alternatives. The gas-electricity coupled integrated energy system includes multiple energy requirements, and different forms of energy such as electricity, heat, and gas are deeply coupled. Through the coordinated operation of multiple energy sources, energy utilization efficiency can be greatly improved. Driven by its own advantages and energy policies, gas-electricity coupled integrated energy systems have developed rapidly. In thi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q50/06
CPCG06Q10/04G06Q50/06
Inventor 于浩吕超贤王成山李鹏赵金利冀浩然宋关羽王旭东郝爽
Owner TIANJIN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products