Method for sealing precipitation well mouth and performing precipitation construction synchronously
A closed plate and circular cover plate technology, applied in infrastructure engineering, construction, etc., can solve problems such as prone to safety accidents, and achieve the effect of improving safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] The present invention will be further described in detail below in conjunction with the accompanying drawings.
[0017] like figure 1 Shown, a kind of method to the closed precipitation construction of precipitation wellhead in this specific embodiment: comprise the following steps:
[0018] (1) Obtain the protection cover of the wellhead for precipitation. The protection cover for the wellhead of the precipitation includes a circular cover plate 1. The center of the circular cover plate 1 is provided with an equipment placement hole concentric with it. The closing plate 2 that closes the equipment installation hole, the upper surface of the closing plate 2 and the position close to its edge are provided with at least three limit buckles, and the center of the closing plate 2 is formed by connecting all the limit buckles in turn In the polygon, the limit buckle includes a rotating shaft fixedly connected to the closing plate 2, a limiting block 3 is arranged on the rot...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
