Construction method of granite geological underground continuous wall trench

A technology for underground diaphragm walls and construction methods, which is applied to sheet pile walls, foundation structure engineering, earth movers/shovels, etc., can solve the problems of low efficiency, poor effect of dealing with partial holes, and high cost, so as to improve efficiency, Save cost and ensure safety effect

Inactive Publication Date: 2019-12-03
中铁七局集团西安铁路工程有限公司
View PDF4 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] Underground diaphragm walls are widely used in our country. Under the geological conditions of sloped granite above 100Mpa, the construction methods of underground diaphragm walls into grooves mainly include: one is to use the treatment method for inclined hard rock formations, including filling stones at the inclined places , pour high-strength concrete, etc., a

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] Below in conjunction with embodiment, further set forth the present invention. In the following detailed description, certain exemplary embodiments of the invention are described by way of illustration only. Needless to say, those skilled in the art would realize that the described embodiments can be modified in various different ways, all without departing from the spirit and scope of the present invention. Accordingly, the description is illustrative in nature and not intended to limit the scope of the claims.

[0021] According to the construction method of forming grooves in the underground diaphragm wall of granite geology according to the embodiment of the present invention, first use the down-the-hole drill to make the guide hole, then use the groove forming machine to clean the soil layer, and finally use the impact drill to flush the rock into the groove. Realized, the specific construction method is as follows:

[0022] Steps for arranging holes: Mark the po...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The embodiment of the invention provides a construction method of a granite geological underground continuous wall trench. Through a hole position placing step, a step of using a down-the-hole drill to construct a guide hole, a step of using a hydraulic grab bucket grooving machine to grab a soil layer, a step of using a pile washing machine to wash rocks and a step of using a double wheel trenchmilling machine to directly mill the rock to form a trench, construction operation is carried out; by using the down-the-hole drill to construct the guide hole first and then using the hydraulic grabbucket grooving machine to clean the soil layer, a novel underground continuous wall combined trench forming process is created on the basis of a traditional construction method; and therefore, on theone hand, difficult problems of hammer deviation, drilling tool jamming, low trench forming efficiency and the like of high-strength inclined plane granite formation underground continuous wall construction are solved; and meanwhile, the safety, quality and progress of the underground continuous wall construction are guaranteed; and the effect is improved, and the cost is saved.

Description

technical field [0001] The invention relates to a construction method for groove-forming an underground continuous wall in granite geology. Background technique [0002] Underground diaphragm walls are widely used in our country. Under the geological conditions of sloping granite above 100Mpa, the construction methods for forming grooves in underground diaphragm walls mainly include: one is to use the treatment method for inclined hard rock formations, including filling stones at the inclined places , pouring high-strength concrete, etc., and then directly forming grooves with an impact drill, this method is costly and has poor effect on dealing with partial holes; the other is the method of using an impact drill to cooperate with a groove forming machine, which is prone to partial hammer and drill sticking , the construction period is long, the efficiency is low, and the quality of the grooves formed by the ground wall is difficult to guarantee. [0003] Therefore, under t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D5/18E02F5/02
CPCE02D5/187E02F5/02
Inventor 武玉山侯鹏于磊
Owner 中铁七局集团西安铁路工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products