Precipitator frame construction method used in winter
A construction method and technology of a settler, which are applied in the processing of building materials, construction, and building construction, etc., can solve the problems of large investment in construction safety measures, low construction safety factor, and long construction period, so as to ensure construction quality and increase The effect of construction danger and safety improvement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.
[0024] It should be noted that in the description of the present invention, the orientation or positional relationship indicated by the term is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply No device or element must have a specific orientation, be constructed, and operate in a specific orientation and therefore should not be construed as limiting the invention.
[0025] Such as Figure 1~2 As shown, the present invention provides a construction method for a settler frame applied in winter weather. A tarpaulin is built according to the height of the settler frame design to enclose the construction space. For example,...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 