Engineering cost management system and method

A management system and engineering cost technology, applied in the field of management system, can solve problems such as inaccurate results, inability to meet project cost assessment, no project construction mode assessment, etc., to ensure smooth operation, accurate cost, and convenient adjustment.

Pending Publication Date: 2020-01-31
北京市建壮咨询有限公司
View PDF15 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The existing project cost management system only collects and counts the data of the project cost, but in the process of statistical calculation, the construction mod

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering cost management system and method
  • Engineering cost management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0035] Embodiment 1: a kind of project cost management system, refer to figure 1 , including a mode selection module 1, an information input module 2, a data collection module 3, a central processing module 4 and a display module 6. In the process of project cost, it is often necessary to adopt different cost calculation modes according to specific project conditions. If it is necessary to expedite the construction period, the labor cost required for the project will be greatly increased. Considering the impact of the construction period, the selection range of corresponding material suppliers will be narrowed, and the cost of raw materials will also fluctuate within a certain range.

[0036] refer to figure 1 , the mode selection module 1 is used to input the current pricing mode information, and sends the pricing mode information to the central processing module 4, and the pricing mode is divided into delay, normal and urgent three calculation modes according to the size of...

Embodiment 2

[0042] Embodiment 2: A project cost management method, using the project cost management system in embodiment 1. Through the information input module 2, input information such as the type of materials required for construction and the amount of use, through the data collection and processing of the data collection module 3 and the central processing module 4, and then generate a cost list, through the inventory statistics module 9 to check the inventory information of the current raw materials For statistics, the current project progress parameters are counted through the progress coordinating module 8, and then the central processing module 4 generates an evaluation report on the impact of project progress and inventory on project cost savings. The staff checks the cost list and the evaluation report through the display module 6.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a project cost management system and method, belongs to the technical field of management systems, and the system and method are characterized in that the project cost management system comprises a mode selection module, an information input module, a data acquisition module, a central processing module and a display module; the mode selection module is used for inputtingcurrent pricing mode information; the information input module is used for inputting current engineering parameters; the data acquisition module is used for acquiring cost data; the central processingmodule processes the cost data information according to the pricing mode information to generate a cost list and sends the cost list to the display module, and the display module displays and outputsthe cost list; the problems that in the statistical calculation process, the construction mode of engineering construction is not evaluated, the cost evaluation result is not accurate enough, and therequirement for project cost evaluation cannot be met are solved. The project cost of the project can be calculated in different modes according to the actual situation of the project, so that the project cost is more accurate and convenient.

Description

technical field [0001] The invention relates to the technical field of management systems, in particular to an engineering cost management system and method. Background technique [0002] The direct meaning of project cost is the construction price of the project. The three elements of project valuation: quantity, price and fee. In a broad sense, engineering cost covers construction engineering cost (civil engineering major and installation major), highway engineering cost, water transportation engineering cost, railway engineering cost, water conservancy engineering cost, electric power engineering cost, communication engineering cost, aerospace engineering cost, etc. Project cost refers to the total cost of a certain project construction, and its core content is investment estimation, design estimation, revision estimation, construction drawing budget, project settlement, final settlement of completion and so on. The main task of the project cost: calculate the direct co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/10G06Q50/08G06Q10/06
CPCG06Q10/103G06Q50/08G06Q10/0639G06Q10/063114G06Q10/063116
Inventor 翟雪丽贾金硕廖诗雨
Owner 北京市建壮咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products