A system and method for matching optimal train scenarios
A train and solution technology, applied in the Internet field, can solve problems such as user inconvenience and incomplete data list, and achieve the effect of reducing decision-making costs, improving user experience, and improving query efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0067] refer to figure 1 , which is a system for matching the best train scheme disclosed in the present invention, including a train ticket query program 1 , a back-end server 2 , a database module 3 and a query module 4 . The train ticket inquiry program 1 is used to form a station selection page 11 for the user to select a departure station and an arrival station (refer to figure 2 ), which is also used to jump to the corresponding query list interface 17 according to the departure site and the destination site selected by the user on the site selection page 11 (refer to image 3 ); the backend server 2 is used to obtain the departure site and the arrival site selected by the user on the site selection page 11, and return the train ticket query list displayed on the query list interface 17 according to the selected departure site and arrival site to: Train ticket inquiry program 1; database module 3 is used for staff to input prefecture-level city information, county-leve...
Embodiment 2
[0073] refer to Figure 4 , is a method for matching the best train scheme based on the system for matching the best train scheme in the first embodiment disclosed in the present invention, comprising the following steps:
[0074] S100. Create a city information database, and establish a mapping relationship between prefecture-level cities and county-level cities;
[0075] S200. Create a train station information database. The train station information database includes the geographic location information of each station and the city to which each station belongs; there is only one city to which each station belongs, that is, a county-level city or a prefecture-level city; it should be noted that this implementation The prefecture-level cities in the example include municipalities directly under the Central Government;
[0076] S300, obtaining the departure site and the arrival site selected by the user; specifically, this step specifically includes: obtaining the geographic lo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


