Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Bridge overload management device and method

A management method and bridge technology, applied in the direction of measuring devices, traffic flow detection, instruments, etc., can solve the problems of high bridge construction difficulty, no overweight vehicle detection and management device, impact on the bridge body, etc., and achieve the goal of preventing bridge collapse accidents Effect

Inactive Publication Date: 2020-02-21
张家嘉
View PDF8 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, the defect of the prior art is that no overweight vehicle detection and management device is set on each branch road leading to the bridge or the main road of the bridge, and only rely on weight limit warning signs to warn vehicles passing the bridge
In order to reduce production costs and expand production profits, some transport companies often illegally load transport vehicles with overweight loads. Overweight transport vehicles not only crush the road surface of the bridge, but also cause frequent maintenance of the bridge road surface, causing traffic jams, and making the majority of office workers miserable. And it will bring great safety hazards, such as bridge collapse, overweight caused the steering wheel to be insensitive and hit the bridge body, etc.
[0004] The construction of the bridge is very difficult, and its cost is also very high. It usually requires billions of funds, and sometimes it takes four or five years to complete the construction. The bridge girder was hit by an overweight vehicle, and the bridge girder had to be replaced. The loss caused by a single girder was several million. The maintenance traffic was blocked for several months, and some people broke through the bridge and fell into the river. If the overweight vehicle lost control and hit The main or auxiliary cables of the bridge will be dangerous to the entire bridge

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge overload management device and method
  • Bridge overload management device and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The principles and features of the present invention are described below in conjunction with the accompanying drawings, and the examples given are only used to explain the present invention, and are not intended to limit the scope of the present invention.

[0018] figure 1 It is a module block diagram of a bridge overload management device provided by an embodiment of the present invention.

[0019] Such as figure 1 As shown, a bridge overload management device includes:

[0020] The vehicle weight collection module obtains vehicle weight information and vehicle number information from the installed weight collection equipment;

[0021] The weight calculation module obtains the final weight value according to the weight information of the vehicle and the vehicle number information;

[0022] The traffic light control module compares the final weight value with the preset weight threshold N1, and if the final weight value is greater than or equal to the preset weight ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a bridge overload management device and method. The device comprises a vehicle weight collection module, a weight calculation module and a traffic light control module. The vehicle weight collection module is used for obtaining vehicle weight information and vehicle number information from an installed weight collection device. The weight calculation module is used for obtaining a final weight value according to the vehicle weight information and the vehicle number information. The traffic light control module is used for comparing the final weight value with a preset weight threshold N1 and controlling a green light to turn into a red light to prohibit vehicles from passing if the final weight value is greater than or equal to the preset weight threshold N1. According to the invention, the total weight of vehicles on a bridge can be effectively controlled within the bearing range of a bridge body, and meanwhile, overloaded vehicles or suspected vehicles can be snapshot and monitored, and bridge collapse accidents caused by overweight vehicles can be prevented.

Description

technical field [0001] The invention mainly relates to the technical field of traffic management equipment, in particular to a bridge overload management device and method. Background technique [0002] In the prior art, bridges are the main traffic facilities for maintaining the smooth flow of urban expressways, especially in some cities close to large rivers, the safety and smoothness of bridges are the most critical parts for maintaining smooth urban traffic. [0003] However, the defect of the prior art is that no overweight vehicle detection and management device is set on each branch road leading to the bridge or the main road of the bridge, and only rely on weight limit warning signs to warn vehicles passing through the bridge. In order to reduce production costs and expand production profits, some transport companies often illegally load transport vehicles with overweight loads. Overweight transport vehicles not only crush the road surface of the bridge, but also cau...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G08G1/01G08G1/017G08G1/08G08G1/087G01G19/03
CPCG01G19/03G08G1/01G08G1/0175G08G1/08G08G1/087
Inventor 张家嘉
Owner 张家嘉
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products