Reasonable material-saving control method for building structure
A technology of building structure and control method, applied in the direction of design optimization/simulation, geometric CAD, etc., can solve the problems of low efficiency, material waste, and the inability to quantitatively analyze the material saving index.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0054] Preferred embodiments of the present invention are specifically described below.
[0055] The invention provides a material-saving control method for building structure rationalization, which is divided into longitudinal deployment based on engineering design stage and horizontal deployment of engineering design content. Among them, according to the engineering design stage, the material saving control method is developed vertically, and the vertical technology is constructed in five design stages according to the concept plan stage, plan deepening stage, preliminary design stage, preliminary design or over-limit review stage, and construction drawing design stage. Frame; according to the engineering design content, the material saving control method is carried out horizontally, according to the structural design basis, the main structural design parameters optimization, structural load, foundation scheme, basement scheme, floor system, lateral force resistance system-sh...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com