Power system static equipment model time sequence construction method and device

A technology of equipment model and power system, applied in the direction of design optimization/simulation, etc., can solve problems such as low frequency of change, inability to obtain power grid equipment models, limitations, etc.

Active Publication Date: 2020-05-29
NARI TECH CO LTD +1
View PDF1 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The change characteristics of the power grid equipment model are irregular, and the frequency of manual modification according to the equipment construction of the power grid is very low. Due to the large number of equipment in the distribution network, the modification frequency is slightly higher, so the general automation system does not save the model of the historical state. , with the maturity of big data technology

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power system static equipment model time sequence construction method and device
  • Power system static equipment model time sequence construction method and device
  • Power system static equipment model time sequence construction method and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0036] An embodiment of the present invention provides a method for constructing a time sequence of a power system static equipment model, such as figure 1 As shown, it specifically includes the following steps:

[0037] (1) Add effective time field and failure time field to the original model table to form a historical model table;

[0038] (2) copy the content in the original model table to the historical model table, and assign values ​​to the effective time field and the failure time field of each equipment model in the historical model table, and complete the initialization of the historical model table;

[0039] (3) In response to the external operation information, set the effective time field, expiration time field and / or content information of the equipment model corresponding to the external operation information in the historical model table, and complete the modification of the equipment model in the historical model table or delete.

[0040] In a specific implem...

Embodiment 2

[0070] Based on the same inventive concept as that of Embodiment 1, the embodiment of the present invention provides a time sequence construction device for a static equipment model of a power system, including:

[0071] Add unit, used to add effective time domain and failure time domain to the original model table to form historical model table;

[0072] The initialization unit is used to copy the content in the original model table to the historical model table, and assign values ​​to the corresponding effective time field and expiration time field, so as to complete the initialization of the historical model table;

[0073] The first processing unit is used to obtain the operation information of the original model table, set the effective time field, expiration time field and / or content information of the equipment model corresponding to the operation information in the historical model table, and complete the operation information in the historical model table Modification...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a power system static equipment model time sequence construction method and device, and the method comprises the steps: adding an effective time domain and a failure time domain into an original model table to form a historical model table; copying the content in the original model table to the historical model table, and assigning the effective time domain and the failuretime domain of each equipment model in the historical model table to complete initialization of the historical model table; and in response to the external operation information, setting an effectivetime domain and a failure time domain of the equipment model corresponding to the external operation information in the historical model table, and completing modification or deletion of the equipmentmodel in the historical model table. According to the invention, the maintenance operation of the model table can be completely recorded, so that the model at any historical time can be quickly queried.

Description

technical field [0001] The invention belongs to the technical field of power system automation, and in particular relates to a method and device for constructing a time sequence of a static equipment model of a power system. Background technique [0002] In the automation system of the power system, it is often necessary to model the primary and secondary equipment of the power network, use the computer system to describe the information of the system management objects, and combine the dynamic measurement data to analyze and manage the operating status of the power system. The power dispatching automation system analyzes the equipment model by combining the current model and real-time data, and stores historical measurement information. When it is necessary to analyze the historical state of the power grid, because there are only historical measurement data and the equipment model only has the current state, it will cause analysis errors. The change feature of the measureme...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F30/20
CPCY02E60/00
Inventor 季堃高尚令少亮许寒阳李慧辉王春玉
Owner NARI TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products