A 3.5-inch slim hole fracturing method for sidetracking horizontal wells in ultra-low permeability sandstone reservoirs
A technology for sidetracking horizontal wells and sandstone reservoirs. It is applied in wellbore/well components, earthwork drilling and production, and production fluids. Minor problems, to achieve a significant effect of increasing production, improve the success rate of temporary plugging, and achieve the effect of long horizontal section
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0022] It should be noted that the structures, proportions, sizes, etc. shown in this specification are only used to match the content disclosed in the specification, for those who are familiar with this technology to understand and read, and are not used to limit the conditions for the implementation of the present invention. Any modification of structure, change of proportional relationship or adjustment of size shall still fall within the scope covered by the technical content disclosed in the present invention without affecting the functions and objectives of the present invention.
[0023] At the same time, terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description and are not used to limit this specification. The practicable scope of the invention and the change or adjustment of its relative relationship shall also be regarded as the practicable scope of the present invention without any sub...
Embodiment 1
[0026] The invention discloses a 3.5-inch slim hole fracturing method for sidetracking a horizontal well in an ultra-low permeability sandstone reservoir, comprising the following steps:
[0027] Step 1) Use the wellbore of the water-flooded oil well to arrange the horizontal section of the sidetracked horizontal well obliquely to the direction of the maximum principal stress of the reservoir;
[0028] Step 2) Perform multi-stage perforation on the low water wash interval of the sidetracked horizontal well;
[0029] Step 3) Running a single-seal fracturing string in the vertical wellbore section of the water-flooded oil well;
[0030] Step 4) Carry out the first stage fracturing construction;
[0031] Step 5) Dosing temporary plugging agent for temporary plugging of first-stage fractures;
[0032] Step 6) Then repeat step 4) and step 5) to complete all stages of fracturing construction;
[0033] Step 7) Shut down the well and release the blowout, and pull out the single-sea...
Embodiment 2
[0035] The invention discloses a 3.5-inch slim hole fracturing method for sidetracking a horizontal well in an ultra-low permeability sandstone reservoir, comprising the following steps:
[0036] Step 1) Use the wellbore of the water-flooded oil well to arrange the horizontal section of the sidetracked horizontal well obliquely to the direction of the maximum principal stress of the reservoir;
[0037] Step 2) Perform multi-stage perforation on the low water wash interval of the sidetracked horizontal well;
[0038] Step 3) Running a single-seal fracturing string in the vertical wellbore section of the water-flooded oil well;
[0039] Step 4) Carry out the first stage fracturing construction;
[0040] Step 5) Dosing temporary plugging agent for temporary plugging of first-stage fractures;
[0041] Step 6) Then repeat step 4) and step 5) to complete all stages of fracturing construction;
[0042] Step 7) Shut down the well and release the blowout, and pull out the single-sea...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 