Construction method of three-span bridge tail beam feeding bridge girder erection machine

The technology of a beam bridge erecting machine and a construction method is applied in the directions of bridges, bridge construction, erection/assembly of bridges, etc., and can solve the problems of long construction period and low work efficiency.

Pending Publication Date: 2020-06-30
CHINA RAILWAY BEIJING ENG GRP CO LTD +1
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the construction of high-speed railway / highway, the bridge erecting machine has been widely used in the construction of erecting railway bridges and highway bridges, which has improved the construction quality, but there is a shortcoming of low work efficiency in the construction process of the bridge erecting machine of the prior art. When the bridge erecting machine feeds the beam, after the hoisting, gluing, prestressing tension and prestressing pipeline grouting of a group of segments are completed, the hoisting, gluing, prestressing tensioning and prestressing of the second group of segments are carried out The pipeline is grouted, and then all sections are hoisted in sequence, which takes a long time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of three-span bridge tail beam feeding bridge girder erection machine
  • Construction method of three-span bridge tail beam feeding bridge girder erection machine
  • Construction method of three-span bridge tail beam feeding bridge girder erection machine

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.

[0039] It should be understood that terms such as "having", "comprising" and "including" as used herein do not entail the presence or addition of one or more other elements or combinations thereof.

[0040] Figure 1-17 It shows an implementation form according to the present invention, wherein the multi-span bridge includes a first side pier 1, a first middle pier 2, a second middle pier 3 and a second side pier 4 set up in sequence along the road extension direction ; The bridge erecting machine includes main girder 5, front support leg 6, middle support leg 7, rear support leg 8, tail auxiliary support leg 9, front and rear 2 cranes 10, electrical system and hydraulic system, and the bridge erecting machine The main girder 5 is composed of 1 to 13 sections, and the three-...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a three-span bridge tail beam feeding bridge girder erection machine. The construction method comprises the steps that S1, a first bracket, a temporarysupport, tail auxiliary supporting legs, a sliding device and a main beam longitudinal moving pushing device are installed; S2, a main beam is hoisted to the temporary support; S3, a front supportingleg, a tail auxiliary supporting leg joist, a rear supporting leg, a crown block and a lifting appliance of the crown block are installed, and a bridge girder erection machine is assembled and debugged; S4, a first middle pier top section and a second middle pier top section are hoisted and fixed; S5, the crown block is used for hoisting a first set of standard sections and a second set of standard sections to be spliced to the first middle pier top section and the second middle pier top section correspondingly, and glue splicing, prestress tensioning and prestress pipeline mud jacking are conducted alternately; S6, all the standard sections are hoisted, glue splicing is completed, and wet joint construction is conducted on a mid-span bridge body; and S7, the beam end sections on the sidespans are spliced to form a complete bridge deck. According to the construction method, when the bridge girder erection machine carries out girder feeding operation, glue splicing, prestress tensioning and prestress pipeline grouting are alternately and synchronously carried out on the standard sections of the first middle pier and the second middle pier, and the construction period can be shortened.

Description

technical field [0001] The invention relates to the technical field of bridge construction. More specifically, the present invention relates to a construction method of a bridge erecting machine. Background technique [0002] In the construction of high-speed railway / highway, the bridge erecting machine has been widely used in the construction of erecting railway bridges and highway bridges, which has improved the construction quality, but there is a shortcoming of low work efficiency in the construction process of the bridge erecting machine of the prior art. When the bridge erecting machine feeds the beam, after the hoisting, gluing, prestressing tension and prestressing pipeline grouting of a group of segments are completed, the hoisting, gluing, prestressing tensioning and prestressing of the second group of segments are carried out The pipeline is grouted and then hoisted in sequence to complete all segments, which takes a long time. Therefore, designing a constructio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 李宾耿庆祥黄洪亮王明友冷志博曾维友
Owner CHINA RAILWAY BEIJING ENG GRP CO LTD