Construction method of three-span bridge tail beam feeding bridge girder erection machine
The technology of a beam bridge erecting machine and a construction method is applied in the directions of bridges, bridge construction, erection/assembly of bridges, etc., and can solve the problems of long construction period and low work efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.
[0039] It should be understood that terms such as "having", "comprising" and "including" as used herein do not entail the presence or addition of one or more other elements or combinations thereof.
[0040] Figure 1-17 It shows an implementation form according to the present invention, wherein the multi-span bridge includes a first side pier 1, a first middle pier 2, a second middle pier 3 and a second side pier 4 set up in sequence along the road extension direction ; The bridge erecting machine includes main girder 5, front support leg 6, middle support leg 7, rear support leg 8, tail auxiliary support leg 9, front and rear 2 cranes 10, electrical system and hydraulic system, and the bridge erecting machine The main girder 5 is composed of 1 to 13 sections, and the three-...