Method for eliminating harmful germs inside ventilation pipeline of air conditioning system
A technology for air conditioning systems and ventilation ducts, applied in space heating and ventilation details, duct arrangement, separation methods, etc., can solve problems such as lack of mechanical elimination of harmful bacteria
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] A method for eliminating harmful germs inside the ventilation duct of an air conditioning system, including completing the construction of the equipment system according to the following steps: air conditioning equipment units (including central air conditioning units, fresh air system hosts or air filtration and purification equipment, referred to as "equipment units") The main exhaust duct 1 is drawn from the return air outlet of the equipment unit and drawn and arranged along the direction of the incoming wind (against the airflow direction of the duct) to each floor of the building (it can be a single floor or multiple floors) and drawn out in each room. Several exhaust branch pipes with return air outlets (several are 2-1000); a ventilation branch pipe 3 is connected to the joint between the above-mentioned main exhaust duct and the return air outlet of the equipment unit, and the control valve 5 is connected to the ventilation branch pipe 3. The ventilation branch ...
Embodiment 2
[0051] A method for eliminating harmful germs inside the ventilation duct of an air conditioning system, including completing the construction of the equipment system according to the following steps: air conditioning equipment units (including central air conditioning units, fresh air system hosts or air filtration and purification equipment, referred to as "equipment units") The main air supply duct 2 is drawn from the air outlet of the equipment unit and installed along the air supply direction (along the airflow direction of the duct) to each floor of the building (it can be a single floor or multiple floors) and inside each room Lead out several air supply branch pipes with air outlets (several are 2-1000); set a ventilation branch pipe with control valve 6 at the joint of the main air supply pipe 2 and the air outlet of the equipment unit Pipe) 4, access an ozone generator 8 through this ventilating branch pipe;
[0052] 1) The main air supply pipe, air supply branch pip...
Embodiment 3
[0059] It is basically the same as Embodiment 1 and 2, the difference is that: step 3) choose to install electric heating and electric heating appliances in the air outlet cavity of each sending (returning) air branch pipe distributed in the airtight room, and the electric heating element whose insulation performance reaches the standard (such as electrothermal alloy wires or foil strips) are set in the inner cavity of each tuyere (or in the pipe connected to the tuyere); the electric control switch of the electric heating appliance for degrading ozone can be connected to the control cabinet of the ozone generator to realize the generation of ozone The linkage of the device can also be set independently in the room.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com