A bridge construction protection device
A protective device and bridge construction technology, which is applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of unstable anti-skid plates and waste of installation time, and achieve good fixing effects, prevent shaking, and facilitate snapping in Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] see Figure 1-3 , the present invention provides a bridge construction protection device technical solution: its structure includes a first lifting rod 1, a clip 2, a protective plate 3, a second lifting rod 4, the first lifting rod 1 and the second lifting rod on the side The elevating rods 4 are parallel, and the first elevating rod 1 and the second elevating rod 4 are connected with clips 2 on the sides, and the clips 2 are matched with the protective plate 3. 21. Electromagnet 22, permanent magnet 23, fixed block 24, guide structure 25, the fixed block 24 is connected to the side of the first lifting rod 1, the guide structure 25 is provided in the fixed block 24, and the moving block 21 is set On the fixed block 24, the moving block 21 is connected with the guide structure 25, the top of the moving block 21 is provided with a starting structure 20, the bottom of the moving block 21 is embedded with an electromagnet 22, and the permanent magnet 23 is embedded in a f...
Embodiment 2
[0031] see Figure 1-6, the present invention provides a bridge construction protection device technical solution: its structure includes a first lifting rod 1, a clip 2, a protective plate 3, a second lifting rod 4, the first lifting rod 1 and the second lifting rod on the side The elevating rods 4 are parallel, and the first elevating rod 1 and the second elevating rod 4 are connected with clips 2 on the sides, and the clips 2 are matched with the protective plate 3. 21. Electromagnet 22, permanent magnet 23, fixed block 24, guide structure 25, the fixed block 24 is connected to the side of the first lifting rod 1, the guide structure 25 is provided in the fixed block 24, and the moving block 21 is set On the fixed block 24, the moving block 21 is connected with the guide structure 25, the top of the moving block 21 is provided with a starting structure 20, the bottom of the moving block 21 is embedded with an electromagnet 22, and the permanent magnet 23 is embedded in a fi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


