technical field
[0001] The invention relates to the technical field of piling guide devices, in particular to an engineering pile guide device in piling construction and a use method thereof. Background technique
[0002] In the construction of cross-sea bridges and wind power high-precision pilings, the current domestic construction units are more popular: use 3 or 4 positioning piles to locate the guiding platform, and a crane ship will lift the guiding platform in place during construction, and measure in advance For preliminary positioning, another crane ship lifts the positioning piles, inserts the positioning piles into the guide platform one by one, and drives them in place with a specially configured piling hammer.
[0003] However, in order to ensure the horizontality of the device, the existing engineering pile guide device in the piling construction needs to make the depth of each positioning hole consistent in the complex seabed environment, which requires a larg...