Full-assembly pressure-bearing type variable-diameter reinforcement cage expansion head anchor rod pile system

A full-assembly pressure-bearing type variable-diameter reinforcement cage expansion head anchor rod pile system comprises a variable-diameter reinforcement cage, a steel bar connector and an anchor rod piece. A limiter is a limiting nut. The limiting nut can be of an open or closed structure and the like. The variable-diameter reinforcement cage is limited by the limiting nut and a bottom plate anchor nut to the anchor rod piece (defined position). The anchor rod piece adopts finish rolling or common threaded steel bars. The steel bar connector is used for the length connection of the steel bar end portions of the anchor rod piece. The top of the anchor rod piece and a bottom plate are anchored, and the bottom of the anchor rod piece and the expansion head reinforcement cage, namely the variable-diameter reinforcement cage, are anchored; the variable-diameter reinforcement cage is provided with a restraining and releasing device, and a concrete or cement mortar crystalline portion iscombined with the expansion head variable-diameter reinforcement cage and an axial rod to form the variable-diameter reinforcement cage expansion head anchor rod pile system; and the variable-diameterreinforcement cage expansion head anchor rod pile framework system is fully assembled.
Owner:安徽俊力建设有限公司

Numerical analysis method for stability of pole tower base on unsaturated expansive soil foundation

The invention discloses a numerical analysis method for stability of a pole tower base on unsaturated expansive soil foundation. According to the method, firstly, a pole tower base model and an unsaturated expansive soil foundation model are created; secondly, corresponding material properties are set for the pole tower base model and the unsaturated expansive soil foundation model respectively; thirdly, correlative analysis procedures are established, grid partition is carried out on the pole tower base model and the unsaturated expansive soil foundation model, boundary conditions for constraining the displacement of the bottom and the periphery of the unsaturated expansive soil foundation model are set, and gravity load and corresponding load on the upper portion of the pole tower base model are applied; finally, operation is submitted, and an operation result is analyzed. The method easily and effectively solves the problems that the pole tower base of an electric transmission lineis deformed and the stability is influenced since the water content rate of the unsaturated expansive soil foundation is changed; the bearing force of the unsaturated expansive soil foundation after the water content rate is changed can be obtained, and the numerical analysis method is provided for determining the stability of the pole tower base on the unsaturated expansive soil foundation.
Owner:STATE GRID CORP OF CHINA +2

Experiment device for testing vertical permeability coefficient of multi-layer geotechnical cloth

The invention relates to the technical field of permeability performance test of geotextile, in particular to an experiment device for testing a vertical permeability coefficient of multi-layer geotechnical cloth. The experiment device comprises a base, wherein a water tank is fixedly arranged at a top end of the base, vertical racks are fixedly arranged at a bottom end of an inner wall of the water tank, a permeation box is fixedly arranged at top ends of the vertical racks, geotechnical cloth placement racks are fixedly arranged at a bottom end of an inner wall of the permeation box, rubbersealing rings are embedded to top ends of the geotechnical cloth placement racks, fixed devices are arranged at two sides of the geotechnical cloth placement racks, grooves are formed in the fixed devices and are corresponding to the rubber sealing rings, a current limiting cylinder is fixedly arranged between the two fixed devices, a through hole is formed in a bottom end of the current limitingcylinder, a water inlet pipe communicates with a top end of the current limiting cylinder, a seepage hole is formed in a bottom end of the permeation box, the other end of the water inlet pipe communicates with a water outlet end of a water pump, and a water inlet end of the water pump communicates with a water storage boxy. The experiment device has the characteristics of high experiment accuracyand high practicability.
Owner:盐城市华志工程材料有限公司

System of utilizing light rays having angles therebetween to carry out displacement monitoring and measurement method thereof

The present invention provides a system of utilizing light rays having angles therebetween to monitor displacement change. The system is characterized by comprising a light ray emitter, a light ray reception target, a data acquisition unit and a remote server, wherein the light ray emitter can emit three beams or multiple beams of light rays having angles therebetween, the light ray reception target is arranged at a monitoring point, and the light ray emitter is arranged at a stable position having a certain distance with the light ray reception target, so that the three beams or multiple beams of light rays having the angles therebetween and emitted by the light ray emitter can irradiate on the light ray reception target directly. The light ray emitter and the light ray reception target are connected with the data acquisition unit via a wireless local area network, the data acquisition unit transmits the displacement change condition to the remote server, and the remote server can store and analyze the data, and carries out the early warning on a monitoring value exceeding an engineering allowable value. The system and method of the present invention can realize the real-time monitoring and the early warning automation, enable the engineering safety to be improved and the personal error to be reduced, are high in monitoring precision and wide in monitoring range, and are convenient to popularize.
Owner:广州市地平线岩土工程有限公司 +2

Plastering omitting process for shear wall structure

The invention relates to a plastering omitting process for a shear wall structure. The plastering omitting process includes steps of 1) constructing a shear wall, wherein construction thickness ranges from 140mm to 300mm, the inner side and the outer side of the wall part of 10-15cm in width at the joint of the shear wall and a filling wall are subjected to reduction of one plastering thickness of 20-25cm; 2) building and constructing the filling wall, wherein the thickness of brickwork is 40-50mm smaller than that of the shear wall, the center of the shear wall is aligned to the center of the filling wall when the filling wall is built, gaps of 20-25mm are reserved on the inner side and the outer side of the filling water respectively; 3) adhering, to be specifically, the joints of the wall are adhered by a cracking net 20-30cm in width; 4) plastering the brickwork of the filling wall, and plastering and leveling a thickness-reduced part of the wall. The plastering omitting process of the shear wall structure has the advantages that dead weight of the wall is reduced, and engineering safety is improved; plastering workload is reduced, decoration and construction time is shortened, resources are saved, common quality problems such as cracks of the plastered inn wall are effectively reduced, and economic and social benefits are increased.
Owner:东阿县诚信建设工程质量检测有限公司

Engineering pile guiding device during piling construction and using method of engineering pile guiding device during piling construction

The invention discloses an engineering pile guiding device during piling construction and a using method of the engineering pile guiding device during piling construction. The engineering pile guidingdevice comprises a lower platform, telescopic positioning columns and connecting rods, wherein the telescopic positioning columns are arranged at the four corners of the bottom end of the lower platform, barbs are arranged on the two side walls of each telescopic positioning column, and a second through hole is formed in the lower platform. The engineering pile guiding device during piling construction and the using method of the engineering pile guiding device during piling construction have the beneficial effects that by arranging the telescopic positioning columns, the length of each telescopic positioning column can be freely adjusted according to the environment in a seabed, the drilling depth of positioning holes does not need to be consistent in a drilling mode, the early-stage workload is reduced, and the functionality of the device is improved; by arranging a left hydraumatic rod, a right hydraumatic rod and a dial, workers can conveniently know the offset of a positioning sleeve, then it can be guaranteed that the positioning sleeve is vertically lowered, the perpendicularity of a cement pile is guaranteed, and the engineering safety is improved; and by arranging an upper air cylinder and a lower air cylinder, the positioning sleeves of different specifications can be locked and fixed, and the practicability of the device is improved.
Owner:CHINA MCC17 GRP

Long-distance continuous measurement method for soil body strength parameters of soft soil site

The invention provides a long-distance continuous measurement method for soil body strength parameters of a soft soil site. The front end of a dragging device is provided with a soil body non-drainingshear strength measurement device, the dragging device actively or passively travels in a soft soil layer, it is guaranteed that a part of the dragging device penetrates into the to-be-measured soillayer during travelling, and the soil entering depth of the dragging device is controlled by adjusting a counterweight on the upper part of the dragging device and the dragging angle. According to theprovided method, the limitation that through a traditional single-point vertical measurement method, the continuous soil body strength parameters in the surface parallel direction cannot be obtainedis broken through, transverse long-distance continuous field measurement of the soil body strength can be completed through a one-time dragging test, and the measured strength parameters can be used for guiding design and construction of breakwater projects and projects such as submarine oil and gas pipelines, cables and optical cables. Especially, with the increasing development of deep-sea oil and gas resources, through the provided method, it is of great significance to measure the submarine soil body strength parameters and apply the submarine soil body strength parameters to design and stability evaluation of project facilities such as the submarine pipelines and the submarine cables.
Owner:DALIAN UNIV OF TECH

Flexible DC converter valve AC connecting line single-phase earth fault protection system and method

The invention relates to a flexible DC converter valve AC connecting line single-phase earth fault protection system and method. The method comprises the following steps that 1) an earth fault is detected according to flexible DC converter protection or valve control; (2) the fault converter valve is locked, and information is sent to pole control; 3) the pole control sends the information to the pole protection, and comprehensively judges the protection action condition; (4) only 800kV pole differential protection action is performed, and the whole pole is locked and stopped immediately; 5) whether converter protection or valve control imbalance protection is earlier than 400kV low-end valve group differential protection or not is judged; (6) a fault VSC converter valve is stopped firstly and a non-fault VSC converter valve is stopped in a delayed mode by means of flexible direct current converter protection or valve control imbalance protection action information; (7) on the basis of the 400kV low-end valve group differential protection action information, the fault VSC converter valve is stopped firstly, and the non-fault VSC converter valve is stopped in a delayed mode; and 8) the protection action process is ended. The system and method can be widely applied to the field of power grid safe operation.
Owner:STATE GRID ECONOMIC TECH RES INST CO +2

Mounting structure and mounting method of deep well pump pipe in civil air defense room of comprehensive building

The invention discloses a mounting structure and a mounting method of a deep well pump pipe in a civil air defense room of a comprehensive building. the pump pipe passes through a pump pit and entersa deep water well. The bottom of the pump pipe is connected to a water pump. A well head bearing frame, a second bottom plate and holt hoop iron above the second bottom plate are arranged in the pumppit. The holt hoop iron has two halves. The two halves of the holt hoop iron are connected to each other by bolts, and one of the two halves is welded to the second bottom plate. Anti-sway spring mechanisms are connected to the upper and lower ends of the water pump. The mounting structure and mounting method solve the problem in the prior art that the diameter of the well head of a deep well pumpin a civil air defense room is narrow, a construction work cannot enter to mount a pipeline bracket, and joint welds between a flange and the pump pipe are prone to crack, thereby resulting in high failure rate, short service life and difficult guarantee of water supply performance in the civil air defense room during wartime, improve the structure strength of the pump pipe member for the deep well pump with narrow wellhead diameter in the civil air defense room, make the lifting and assembling flexible and convenient, prolong the running time of the equipment, and save the maintenance cost.
Owner:中国华西企业股份有限公司

Pipeline sleeper used for reinforced concrete drainage pipeline

The invention provides a pipeline sleeper used for a reinforced concrete drainage pipeline. The pipeline sleeper used for the reinforced concrete drainage pipeline comprises a sleeper body which is of a frame body structure. The sleeper body comprises a first side plate, a second side plate, a third side plate and a fourth side plate which are sequentially connected end to end, wherein the first side plate and the third side plate are arranged oppositely, and the second side plate and the fourth side plate are arranged oppositely, and a first groove and a second groove which are used for mounting the pipeline are formed in the upper end face of the first side plate and the upper end face of the third side plate correspondingly. The pipeline sleeper is arranged on a foundation where a trench is dug, and then the pipeline is placed in a bearing plate of the pipeline sleeper; using is convenient and fast, the elevation and straightness of the pipeline can be guaranteed, labor intensity is relieved, the construction period is shortened, the construction quality is improved, and construction work is safe; the first strip-shaped groove and the second strip-shaped groove are formed, and the pressure applied to the bearing plate by the pipeline is dispersed onto the two sides of the first side plate and the third side plate, so that the bearing capacity of the pipeline sleeper is improved, and the service life of the pipeline sleeper is prolonged; and the sleeper body is of the frame body structure, so that materials are saved, labor cost is reduced, and the weight of the sleeper body is reduced.
Owner:宣城市政建设集团有限公司

Overturning device for vertical-stacked precast concrete wallboards

The invention relates to an overturning device for vertical-stacked precast concrete wallboards. The overturning device comprises a horizontal base and a steel baffle plate; a certain included angle is formed between the horizontal base and the steel baffle plate; the horizontal base and the steel baffle plate are fixedly connected through a triangular support frame; a reinforcing steel arm and the triangular support frame are across arranged, and are fixedly connected through bolts; the lower end of the reinforcing steel arm is fixedly connected with the bottom of the steel baffle plate; fixed bolts for pressing precast concrete wallboards to be overturned to the inner sides and with adjustable pressing degree are pairwise arranged on the steel baffle plate, the reinforcing steel arm andthe horizontal base; and the back part of the steel baffle plate has a certain radian to relieve the impact effect on the steel baffle plate by the weights of the precast wallboards and the overturning device in the overturning process. The overturning device improves the scene overturning efficiency of the precast wallboards, prevents the damage problem in scene overturning of the precast wallboards, has the characteristics of high lifting speed and guarantee of the integrity of the wallboards, guarantees the quality of the wallboards, and improves the engineering efficiency and the safety.
Owner:SHANGHAI BAOYUE RESIDENTIAL IND CO LTD +1

Steel structure high-altitude welding cage-type closed environment operation platform and using method thereof

PendingCN111424951ASolve the problem of high-altitude operation riskSolve the quality problem of weld seam in steel structureBuilding support scaffoldsClassical mechanicsWelding
The invention provides a steel structure high-altitude welding cage-type closed environment operation platform and a using method thereof, and belongs tothe technical field of building engineering.Acolumnar steel structure is sleeved with an annular plate, a bottom annular platform, a top annular platform and an inner sleeving ring from bottom to topsequentially; the annular plate is fixedly connected with an outer eave of the bottom annular platform by lower inclined rods; an outer eave of the top annular platform is fixedly connected with the inner sleeving ring by upper inclined rods, and the upper inclined rods are distributed in the circumference of the top annular platform and the inner sleeving ring at equal intervals; inner rings of the bottom annular platform and thetop annular platform are fixedly connected by inner vertical rods, outer rings of the bottom annular platform and the top annular platform are fixedly connected by outer vertical rods and diagonal braces, and the inner vertical rods, the outer vertical rods and the diagonal braces are all distributed in the circumference of the bottom annular platform and the top annular platform. Theproblems of high high-risewelding difficulty of the steel structure and increased aerial working risk as the building height increases continuously are solved.
Owner:CHINA CONSTR FOURTH ENG DIV

Dry towing transporting float-on process of floating production, storage and offloading device

The invention provides a dry towing transporting float-on process of a floating production, storage and offloading device. The dry towing transporting float-on process of the floating production, storage and offloading device comprises the following steps of 1, doing preparation work before loading of a semi-submerged ship; 2, wetly towing the floating production, storage and offloading device toreach a float-on location; 3, carrying out longitudinal shipment float-on operation on the floating production, storage and offloading device; and 4, carrying out shipment fixing and dry towing transportation on the floating production, storage and offloading device. Under the cooperation of a semi-submerged ship buoyancy tank winch cable and a harbour tugboat, the floating production, storage andoffloading device is towed to be kept stable after being reaching a preset shipment position; by using laser alignment to monitor relative positions of the semi-submerged ship and the floating production, storage and offloading device, the semi-submerged ship floats to support the floating production, storage and offloading device till reaching transporting draft; by welding a shipment fixing piece, the dry towing transporting float-on operation of the floating production, storage and offloading device is finished, and the semi-submerged ship carries the floating production, storage and offloading device to realize dry towing transporting sailing; the floating production, storage and offloading device is transported by using the semi-submerged ship; the working period is shortened, the engineering cost is saved, and the safety is good.
Owner:OFFSHORE OIL ENG CO LTD

Aerator for flat-bottomed water release structure

The invention relates to an aeration device for a flat-bottomed drainage structure, which adopts the combination of lifting sill, aeration tank and drop sill for aeration, and installs a flow sill at the rear of the aeration tank. The contour line of the upper part of the flow sill gradually extends from the top to the bottom against the direction of the water flow. In the section where the water flow at the back of the cavity collides with the flow sill, the upper contour line of the flow sill gradually extends to the bottom along the direction of the water flow. Advantages of the present invention: (1) The angle of intersection between the jet flow and the sticking flow sill is small after passing through the ventilation groove, and it is not easy to generate backtracking water flow to block the cavity. gas efficiency; (2) Removing excess parts helps to improve the pressure distribution in the cavity and increase the area of ​​the cavity’s water-air contact surface; (3) Without changing the shape of the upstream ridge, it is equivalent to increasing the effective ridge (4) It is beneficial for the high-speed jet to discharge the accumulated water in the ventilation tank. The invention has a simple and easy structure, can reduce engineering investment, improve engineering safety, and has good application prospects.
Owner:HOHAI UNIV

A kind of plaster-free technology for shear wall structure

The invention relates to a plastering omitting process for a shear wall structure. The plastering omitting process includes steps of 1) constructing a shear wall, wherein construction thickness ranges from 140mm to 300mm, the inner side and the outer side of the wall part of 10-15cm in width at the joint of the shear wall and a filling wall are subjected to reduction of one plastering thickness of 20-25cm; 2) building and constructing the filling wall, wherein the thickness of brickwork is 40-50mm smaller than that of the shear wall, the center of the shear wall is aligned to the center of the filling wall when the filling wall is built, gaps of 20-25mm are reserved on the inner side and the outer side of the filling water respectively; 3) adhering, to be specifically, the joints of the wall are adhered by a cracking net 20-30cm in width; 4) plastering the brickwork of the filling wall, and plastering and leveling a thickness-reduced part of the wall. The plastering omitting process of the shear wall structure has the advantages that dead weight of the wall is reduced, and engineering safety is improved; plastering workload is reduced, decoration and construction time is shortened, resources are saved, common quality problems such as cracks of the plastered inn wall are effectively reduced, and economic and social benefits are increased.
Owner:东阿县诚信建设工程质量检测有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products