Method and system for calculating soil pressure of foundation pit support structure under bilateral coupling deformation

The invention relates to the technical field of foundation pit engineering, and discloses a foundation pit enclosure structure soil pressure calculation method and system under bilateral coupling deformation, and the method comprises the steps: obtaining deformation correlation parameters of an enclosure structure of a target foundation pit; initial deformation fitting is conducted on the enclosure structure, active and passive initial soil pressure of the enclosure structure is obtained, and the initial soil pressure is associated with the embedding depth of the enclosure structure; the deformation correlation parameters and the initial soil pressure are input into the bilateral coupling deformation calculation model, and horizontal deformation of the two sides of the enclosure structure is obtained; inputting the horizontal deformation of the two sides into a non-limit soil pressure calculation model to obtain the soil pressure of the enclosure structure; and if the horizontal deformation on the two sides and the soil pressure do not meet the convergence requirement, inputting the soil pressure into the bilateral coupling deformation calculation model for iteration. According to the method, the stress conditions of the two sides of the enclosure structures can be considered, so that the mutual influence of stress between the enclosure structures on the two sides is coupled.
Owner:EAST CHINA JIAOTONG UNIVERSITY

Design optimization method for spiral anchor foundation structure of line tower

The invention discloses a line tower screw anchor foundation structure design optimization method, and relates to the technical field of structure design optimization, and the method comprises the following steps: determining the depth of construction soil according to the scale of a line tower, and collecting screw anchor influence data of different depths of the construction soil, the screw anchor influence data comprises screw anchor corrosion influence data and soil acting force influence data; constructing a screw anchor influence model based on machine learning according to the screw anchor influence data, and generating a screw anchor structure influence coefficient; obtaining screw anchor structure influence coefficients of different depth areas, judging substandard depth areas on the basis of preset screw anchor stress coefficients, and performing structure optimization on the screw anchors in the depth areas; whether the optimization effect reaches the standard or not is judged based on the screw anchor stress coefficient by obtaining the optimized screw anchor structure influence coefficient. Through structural optimization design, the problem that the spiral anchor is unstable due to soil properties and geological environments of different regions is solved.
Owner:ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER +1

Displacement prediction system and method for steel cylinder soil retaining structure of soft soil foundation

The invention discloses a soft soil foundation steel cylinder soil retaining structure displacement prediction system, which comprises a data acquisition module arranged around a steel cylinder soil retaining structure and used for monitoring construction data in real time; the data primary processing module is used for carrying out primary processing on the collected data; the data processing and analyzing module is used for performing data analysis and processing through an MSD method and calculating mobilization shear strength; the displacement prediction module is used for establishing a stress-strain relation model of the soil body according to the mobilization shear strength and predicting the displacement of the steel cylinder soil retaining structure; and the feedback adjustment module is used for providing construction adjustment suggestions according to the prediction result, dynamically adjusting construction parameters and optimizing the stress-strain relation model of the soil body. The invention further discloses a displacement prediction method for the steel cylinder soil retaining structure of the soft soil foundation. The displacement change of the retaining structure in the whole engineering period is accurately predicted, and the risk of structural instability is effectively prevented.
Owner:CCCC THIRD HARBOR ENGINEERING CO LTD

Construction method for blocking goaf through 3D printing foam light soil

The invention provides a construction method for blocking a goaf through 3D printing foam light soil, relates to the technical field of goaf treatment, and aims at solving the problem that slurry overflow is inconvenient to control during goaf filling at present, partition walls are built on the side face of the goaf through 3D printing, the distribution positions and distribution forms of the partition walls are controllable, and therefore a blocking structure for slurry overflow is formed; the top end and the bottom end of the partition wall extend to the top and the bottom of the goaf correspondingly, so that during grouting filling, filling grout can preferentially cover the interior of the goaf, and the problems of grout spreading loss and resource waste are reduced.
Owner:济商高速公路(菏泽)有限公司 +4

Monitoring method and monitoring system for building engineering construction environment

The invention relates to the field of equipment control, and discloses a building engineering construction environment monitoring method and system, and the method comprises the steps: a cloud data server builds a construction monitoring management container, obtains the concrete parameters of each construction stage, and obtains the concrete expected strength according to the concrete parameters; respectively carrying out pressure testing on the concrete test blocks poured according to the concrete parameters and the corresponding vibration parameters to obtain the actual strength of the concrete test blocks, and obtaining the strength achievement rate of the concrete test blocks according to the difference value between the actual strength and the expected strength of the concrete test blocks; if the strength achievement rate of each concrete test block exceeds a preset strength achievement rate threshold value, construction monitoring of the construction environment is completed. Manual intervention is reduced through automatic monitoring and intelligent regulation and control, the construction progress is accelerated, and meanwhile dependence on experience of operators is reduced.
Owner:SICHUAN ROAD & BRIDGE SHENGTONG CONSTR ENG CO

Hydrological situation change analysis method and system for hydrological engineering

The invention relates to the technical field of hydrological monitoring, in particular to a hydrological situation change analysis method and system for hydrological engineering. The method comprises the following steps: acquiring remote sensing data of a hydrological monitoring area, and performing river morphological change analysis according to the remote sensing data of the hydrological monitoring area so as to obtain river morphological change data; hydrological equipment measurement information data are obtained, water body section feature extraction and water flow velocity feature extraction are carried out according to the hydrological equipment measurement information data, and therefore water body section data and water flow velocity data are obtained; performing water flow analysis according to the water body section data and the water flow velocity data to obtain water flow data; and performing section orientation classification according to the hydrological equipment measurement information data so as to obtain left section hydrological equipment measurement information data and right section hydrological equipment measurement information data. The hydrological situation prediction task is completed based on the hydrological monitoring technology.
Owner:PEARL RIVER HYDROLOGY & WATER RESOURCES SURVEY CENT

Main arch ring design method for rapid construction of large-span cast-in-cantilever arch bridge

The invention discloses a main arch ring design method for rapid construction of a large-span cast-in-cantilever arch bridge. The main arch ring design method comprises the following steps: establishing a macroscopic finite element model according to arch bridge information; a local finite element model is established for the steel-concrete main arch ring, load simulation is conducted on the steel-concrete main arch ring, and arch ring information is determined; obtaining an anti-overturning coefficient of the arch bridge according to the macroscopic finite element model, and obtaining an anti-seismic property value of the arch bridge by utilizing anti-seismic simulation; acquiring disease early warning information according to the load simulation and the anti-seismic simulation, and implementing a disease early warning strategy; load simulation is conducted according to the steel-concrete main arch ring structure through the finite element model, stiffening connection steel plate information and steel hole information of the optimal arch ring strategy are obtained, the load bearing capacity, the anti-seismic performance and the anti-overturning performance of the arch bridge are improved, the self weight of the main arch ring is effectively reduced, arch ring steel bars are connected through the stiffening connection steel plates, and the safety of the arch bridge is improved. Factory-like rapid and high-precision installation of the bottom face is achieved, and the working efficiency and the engineering safety can be greatly improved through whole-section hoisting.
Owner:GUIZHOU TRANSPORTATION PLANNING SURVEY & DESIGN ACADEME

Calculation method of composite foundation inter-pile soil bearing capacity characteristic value

The invention relates to the technical field of foundation treatment of civil engineering, in particular to a method for calculating a composite foundation inter-pile soil bearing capacity characteristic value, which comprises the following steps of: determining an inter-pile soil void ratio before reinforcement treatment, determining the diameter and center spacing of a reinforced pile, determining an equivalent diameter after reinforcement according to the layout of the reinforced pile, and calculating the composite foundation inter-pile soil bearing capacity characteristic value. Calculating the void ratio of the soil between the piles after reinforcement treatment, and establishing a bearing capacity characteristic value calculation formula to calculate the bearing capacity characteristic value of the soil between the piles after reinforcement treatment; according to the method, a calculation formula related to soil empirical parameters, the void ratio of the reinforced soil body and the bearing capacity characteristic value of the soil between the reinforced piles is established by considering factors such as the diameter of the reinforced piles, the center distance and the equivalent diameter after reinforcement, and inconvenience and errors caused by dependence on a traditional field test method such as a heavy static sounding test are avoided.
Owner:CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE

A movable verticality detection device for engineering quality inspection

The present invention relates to a movable verticality detection device for engineering quality inspection applied to the technical field of measuring devices. The device adopts a spherical shell sealing structure, the interior of which is filled with liquid and evacuated to improve vibration isolation performance. The device is provided with a horizontal shell and a vertical shell supported by buoyancy, and resists external disturbances through a high-speed rotating turntable to provide a stable reference direction. Laser reflection lenses and prisms are used to project a laser beam onto the surface of an object to be measured, and the verticality is judged by comparing the light band deviation. The device adopts a conductive coil to transmit power and signals, and a laser angle detection component corrects errors in real time. The permanent magnet adsorption method is easy to install, and the controller realizes automatic operation and data processing, thereby improving detection efficiency and accuracy. The present invention integrates laser and electronic technologies, realizes automatic and intelligent detection, improves detection accuracy and efficiency, is suitable for engineering construction, precision instrument calibration and other fields, and has broad application prospects.
Owner:JIANGSU ZHENGLU ENG INSPECTION CO LTD

High-specific-gravity self-compacting concrete and preparation method thereof

The invention belongs to the technical field of concrete, and particularly relates to high-specific-gravity self-compacting concrete and a preparation method thereof. The high-specific-gravity self-compacting concrete is prepared from the following raw materials in parts by mass: 560 to 671 parts of natural coarse aggregate, 725 to 906 parts of iron ore, 300 parts of natural fine aggregate, 446 parts of steel slag sand, 383 parts of cement, 0 to 54 parts of steel slag powder, 107 parts of fly ash, 2.6 to 13.6 parts of water reducing agent and 150 to 182 parts of water. The performance of the concrete is greatly improved by improving the microcosmic performance of the concrete and grading of all the components, and the purposes of reducing the use amount of cement, reducing shrinkage and creep of the concrete, reducing CO2 emission, saving energy, protecting the environment and achieving green construction are achieved while high specific gravity, self-compaction and high strength of the concrete are achieved.
Owner:CHANGZHOU UNIV +1

Prediction method for initial stress state of high earth and rockfill dam and soil foundation

The invention discloses a method for predicting the initial stress state of a high earth and rockfill dam and a soil foundation, and relates to the technical field of earth and rockfill dam engineering. According to the method for predicting the initial stress state of the high earth and rockfill dam and the soil foundation, the vertical stress and the horizontal stress of the soil body at any depth are accurately calculated by comprehensively analyzing key factors such as soil body gradation and relative compactness, so that the prediction precision of the initial stress state of the high earth and rockfill dam and the soil foundation is remarkably improved, and the prediction accuracy of the initial stress state of the high earth and rockfill dam and the soil foundation is improved. The method has the advantages that more reliable data support is provided for engineering design and construction, the whole prediction process is standardized and systematized through specific step-by-step processes including soil body grading area determination, soil body density measurement, stress calculation and the like, engineering technicians can quickly master and apply the method conveniently, and dependency on professionals is reduced.
Owner:GUANGXI UNIV +2

Assembly type prefabricated building installation construction management method and system

The invention discloses an assembly type prefabricated building installation construction management method and system, and relates to the technical field of building construction.Intelligent terminal equipment is arranged for personnel and equipment on a construction site, and real-time interaction and cooperative work between the personnel and the equipment are achieved through the indoor positioning technology and the wireless communication technology; according to the intelligent collaborative operation management mode, various state information of construction site personnel and equipment can be accurately mastered in real time, and task allocation and operation sequence optimization are carried out based on the information, so that the construction personnel can be engaged in work which is most matched with the skills of the construction personnel at the most appropriate time, and the working efficiency is improved. Construction equipment can be fully and reasonably utilized, idle and waste of personnel and equipment are avoided, waiting time and resource mismatching phenomena in construction are reduced, and therefore the construction period is greatly shortened.
Owner:NANJING CONSTR CO LTD

Method for preparing red mud-based geopolymer based on microwave irradiation and multi-solid-waste combined excitation

The invention relates to a method for preparing a red mud-based geopolymer based on microwave irradiation and multi-solid-waste combined excitation, and aims to prepare a low-energy-consumption geopolymer capable of realizing large-dosage utilization of red mud. The method comprises the following steps: irradiating the red mud through a microwave oven to excite the gelling activity of the red mud, then adding fly ash, carbide slag and phosphogypsum into the red mud, and carrying out secondary excitation on the red mud by using an alkaline environment brought by the carbide slag and a sulfate environment of the phosphogypsum to realize geopolymerization reaction of a red mud system. Therefore, the low-energy-consumption all-solid waste red mud-based geopolymer is prepared under the condition of no traditional thermal field calcination and no industrial alkali activator. According to the invention, a traditional heat source is replaced by a green and efficient microwave energy source, and a traditional commercial alkali activator and a sulfate activator are replaced by alkaline solid wastes such as carbide slag and ardealite and sulfate solid wastes, so that the production cost is greatly reduced; a new technical path is provided for large-scale resourceful treatment and industrial utilization of the red mud in the field of building materials.
Owner:KUNMING UNIV OF SCI & TECH

Engineering data digital delivery method and system based on BIM large model

The invention relates to the technical field of data delivery, and discloses an engineering data digital delivery method and system based on a BIM large model, and the system comprises a data collection unit, a data integration unit, an association processing unit, and a data delivery unit. According to the method, various data are collected from each related system and terminal of the project, rich contents such as a BIM model and a design drawing are covered, a complete data basis is provided for project management, and information loss is avoided; a specific conversion algorithm is adopted for data of different sources, for example, CAD drawings and the like are subjected to accurate format conversion and association, an information base is constructed with a BIM model component as a core, and data availability and management efficiency are improved; by assigning a unique identifier to the component and establishing association between multiple aspects and the component, information of each stage of the component can be conveniently traced, and engineering management is powerfully supported; by means of correlation analysis, the data value is improved, data potential relations are mined, problems are found, the scheme is optimized, and more valuable information is provided for operation and maintenance management.
Owner:ZHONGKE WEIYI (SUZHOU) INTELLIGENT TECH CO LTD

A deformation self-adaptive anti-seepage structure of a dike connecting section

ActiveCN224605496UEasy to embedAvoid hollowing and cracking
The utility model discloses a kind of deformation self-adapting anti-seepage structures of embankment linking section, including embankment, embankment crossing building, the side pier both sides of embankment crossing building located in embankment are provided with concrete spur wall, concrete spur wall outside and intermediate position are reserved with notch, flat plate type plastic steel sheet pile is horizontally inserted into notch and is set, the undisturbed soil layer of embankment is formed with undisturbed soil layer by in-situ mixing, wave type plastic steel sheet pile is horizontally inserted into undisturbed soil layer by in-situ mixing, flat plate type plastic steel sheet pile and wave type plastic steel sheet pile are flexibly linked to form composite anti-seepage structure type by using lock catch, can solve linking section leakage problem, improve engineering full life cycle safety, with deformation coordination, construction controllability and anti-seepage reliability and other technical features.
Owner:ZHEJIANG DESIGN INST OF WATER CONSERVANCY & HYDROELECTRIC POWER

Auxiliary supporting system for building flat-top straight-wall tunnel structure

The utility model relates to the technical field of rail transit tunnel engineering, in particular to an auxiliary supporting system for building a flat-top straight-wall tunnel structure. The auxiliary supporting system for building the flat-top straight-wall tunnel structure comprises a transverse auxiliary support and a vertical auxiliary support, and further comprises a jet reinforced concrete primary supporting structure and C-shaped reinforced concrete secondary lining structures poured on the two sides of the interior of the jet reinforced concrete primary supporting structure. The transverse auxiliary support pre-embedded fixing steel plate is arranged at the end part of the reinforced concrete secondary lining structure; the transverse auxiliary support is arranged between the reinforced concrete secondary lining structures; the vertical auxiliary support is perpendicular to the transverse auxiliary support, and the two ends of the vertical auxiliary support are connected with the jet reinforced concrete primary support structure. And after the transverse auxiliary support pre-embedded fixing steel plate, the transverse auxiliary support and the vertical auxiliary support are erected, a top plate and a bottom plate of the reinforced concrete secondary lining structure are poured, all the sprayed reinforced concrete primary support structures and the vertical auxiliary supports in the inner range of the tunnel space are dismantled, and the tunnel structure construction step sequence is completed.
Owner:BEIJING BUILDING MATERIALS & GEOLOGICAL ENG CO LTD +1

Steel bar planting glue pipe, steel bar planting glue injection device and use method of steel bar planting glue injection device

The invention provides a steel bar planting glue pipe, a steel bar planting glue injection device and a using method of the steel bar planting glue pipe. The steel bar planting glue pipe is used for being connected to a steel bar planting glue gun so as to convey steel bar planting glue to a steel bar planting hole. The steel bar planting rubber pipe comprises a first rubber pipe, and the outer diameter of the first rubber pipe is slightly smaller than or equal to the outer diameter of a steel bar to be planted. The first rubber pipe is slidably sleeved with a push-pull ring, the inner wall of the push-pull ring is attached to the outer wall of the first rubber pipe, and the outer diameter of the push-pull ring is not smaller than the inner diameter of the steel bar planting hole. According to the steel bar planting glue pipe, the steel bar planting glue injection device and the using method of the steel bar planting glue pipe, in the steel bar planting glue injection process, a proper amount of steel bar planting glue can be output to the steel bar planting hole through the first glue pipe without depending on the experience of a steel bar planting worker, waste of the steel bar planting glue can be avoided, the steel bar planting glue can be effectively distributed on the hole wall of the steel bar planting hole, and the steel bar planting quality is improved. Therefore, the adhesion degree of the to-be-implanted steel bar and the building structure can be enhanced, and the engineering safety can be improved.
Owner:SHANGHAI BAOSTEEL ENG CONSULTING CO LTD

Ablation-resistant prefabricated part of diversion trench, composition structure of diversion trench and construction method of diversion trench

The invention relates to the related technical field of diversion trenches, and provides an ablation-resistant prefabricated part of a diversion trench, a composition structure of the diversion trench and a construction method of the diversion trench. The ablation-resistant prefabricated part of the diversion trench comprises a prefabricated body and a connecting structure, the prefabricated body is provided with a mounting hole channel, and the connecting structure is arranged in the mounting hole channel of the prefabricated body; the connecting structure is used for detachably installing the prefabricated body in a preset area. According to the ablation-resistant prefabricated part, the prefabricated body of the ablation-resistant prefabricated part is detachably installed in the preset area through the connecting structure, the fireproof layer forming the flow guide groove is replaceable and easy to disassemble and assemble and can be disassembled according to needs, the construction period is shortened, the construction cost is low, the repairing workload is small, and the engineering quality and safety are improved.
Owner:BEIJING BUILDING MATERIALS ACADEMY OF SCI RES +1

A construction method and system for a highway passing through a coal seam goaf section

The present invention discloses a construction method and system for a highway crossing a coal seam goaf section, and the construction method includes the following steps: analyzing the depth, range and geotechnical characteristics of multi-layer goaf areas according to geological survey results; using professional drilling rigs to set up grouting holes at key positions of different layers of goaf areas; using high-precision measuring equipment to monitor the size of the voids in the goaf areas in real time, and selecting grouting equipment according to soil geological conditions and grouting materials; using the grouting equipment to perform layered three-dimensional cross grouting; real-time monitoring of potential dangerous phenomena inside the foundation; using geological radar to detect the grouting effect and analyze the detection data; and evaluating whether it is necessary to combine other foundation reinforcement technologies. The high-precision measuring equipment of the present invention can monitor the size of the voids in the goaf areas in real time and obtain the size, depth and morphology of the voids in a timely manner, which is helpful to timely discover potential safety hazards and improve the accuracy of foundation reinforcement projects.
Owner:HENAN JIAO YUAN ENG TECH CO LTD +1

Rotor mounting pit self-drainage structure

This application relates to a self-drainage structure for a rotor installation pit. This application is applicable to the field of hydropower construction technology. The technical problem to be solved by this application is: to provide a self-drainage structure for a rotor installation pit. The technical solution adopted in this application is: a self-drainage structure for a rotor installation pit, comprising: an upper drainage hole formed between the installation pit and a construction support tunnel below the installation pit, the upper end of the upper drainage hole connecting to the bottom of the installation pit, and the lower end of the upper drainage hole connecting to the construction support tunnel; a middle drainage pipe disposed within the construction support tunnel, the upper end of the middle drainage pipe connecting to the lower end of the upper drainage hole, and the lower end of the middle drainage pipe extending to a drainage ditch at the bottom of the construction support tunnel; and a lower drainage hole formed between the construction support tunnel and a self-drainage tunnel below the construction support tunnel, the lower drainage hole connecting to a drainage ditch at the bottom of the construction support tunnel, and the lower end of the lower drainage hole connecting to the self-drainage tunnel.
Owner:POWERCHINA HUADONG ENG CORP LTD

Energy storage deicing building block brick based on industrial waste

PendingCN121992694AWidely used valueImprove the level of comprehensive utilizationMultiple fixed capacitorsSingle unit pavingsBrickStructural engineering
The invention belongs to the technical field of functional building materials, and particularly relates to an industrial waste-based energy storage and deicing building block brick, which comprises a cavity brick body, a brick cover arranged at the top of the cavity brick body, and a capacitor array arranged in a cavity of the cavity brick body, the cavity brick body is of a cuboid hollow structure, the top of the cavity brick body is open, the brick cover is a rectangular cover plate matched with the cavity brick body, the capacitor array comprises a plurality of capacitor monomers which are connected in series, and a separation diaphragm is arranged between every two adjacent capacitor monomers; each capacitor monomer comprises an anode electrode, an anode electrolyte, a diaphragm, a cathode electrolyte and a cathode electrode which are connected in sequence. The capacitor array is used as an energy storage unit to be integrated in the cavity of the cavity brick body, synchronous construction of energy storage and building block brick components is achieved through the cavity brick body-capacitor array-brick cover integrated structure, the system integration degree is high, the structure is compact, road paving and subsequent modular replacement and maintenance are facilitated, and the integrated energy storage and building block brick is suitable for application and popularization.
Owner:HENAN SITONG ENG TESTING CO LTD +1

A pipe rust removal device

This utility model relates to the field of pipe processing technology and discloses a pipe rust removal device, including a worktable and a slider. A vertical plate is fixedly connected to the upper surface of the worktable, and a groove is formed on the upper surface of the worktable. The outer wall of the slider is slidably connected to the inner wall of the groove. A support is fixedly connected to the upper surface of the slider, and a rotating frame is rotatably connected to the inner wall of the support. A cylinder is fixedly connected inside the rotating frame, and a sleeve is rotatably connected to the outer wall of the cylinder. A steel brush is slidably connected to the inner wall of the sleeve. In this utility model, through the mutual cooperation of the support, rotating frame, steel brush, sleeve, cylinder, support plate, motor, threaded rod, square block, U-shaped steel frame, and cylinder, the device adapts to different pipe diameters, improving the versatility of the rust removal device, reducing costs, and ensuring rust removal quality. It is suitable for various engineering and maintenance scenarios.
Owner:TIANJIN SHUNXINCHENG TECH DEV CO LTD

Water conservancy project earthwork filling control system based on BIM + GIS

The invention provides a hydraulic engineering earthwork filling control system based on BIM + GIS, and relates to the technical field of earthwork filling control. The hydraulic engineering earthwork filling control system comprises a BIM and GIS-based control system, the BIM and GIS-based control system is connected with a system assembly and a system function, the system assembly and the system function are connected with an environment influence early warning system, and the environment influence early warning system comprises a data acquisition and integration module, a data processing module, a data processing module and a data processing module. The data acquisition and integration module is connected with an established machine learning model, the established machine learning model is connected with a scene simulation and analysis module, the scene simulation and analysis module is connected with optimized earthwork filling, and the optimized earthwork filling module is connected with adaptive measure formulation. By integrating BIM and GIS technologies into the hydraulic engineering earthwork filling control system, the engineering quality and safety can be improved, and by establishing a machine learning model, the influence of climate change on the hydraulic engineering earthwork filling control system can be accurately predicted.
Owner:XIAMEN FANXIANG INTELLIGENT TECHNOLOGY CO LTD

Support structure for preventing rock collapse

ActiveCN224716978UFlexible adjustment of tilt angleFlexible direction adjustment
The utility model relates to a supporting structure for preventing rock collapse relates to rock slope engineering technical field, fixed frame is equipped in the outside of the protective net body, fixed screw rod is respectively in the loose of fixed frame, fixed nut is respectively through the thread of screw joint and is equipped in fixed screw rod, fixed nut is located in fixed frame, connecting rod is respectively equipped in the rear end of fixed screw rod, adjusting ball is respectively embedded in the upper end of connecting rod, the upper end of adjusting ball is fixed with fixed screw rod, drainage mechanism is respectively inserted in the protective net body, can adjust the inclination angle and direction of fixed screw rod, adapt to the complex terrain of different rock side wall, can effectively prevent rock collapse and rock block roll, can more closely with rock side wall of protective net body, strengthen the protection effect, improve the engineering safety, can effectively discharge the accumulated water in rock, avoid the collapse of rock because of accumulated water corrosion.
Owner:JIANGXI XINDA GEOLOGICAL DISASTER PREVENTION & CONTROL CO LTD

Ultrahigh slope revetment supporting structure suitable for different soil layers and construction method

The invention belongs to an ultrahigh side slope revetment supporting structure suitable for different soil layers and a construction method. According to the ultrahigh side slope revetment supporting structure and the construction method, supporting schemes of all areas are designed according to geological exploration and supporting area division of an ultrahigh side slope; the supporting method that locking anchor rods, system anchor rods, pre-stressed anchor cables, an outer sealing and spraying concrete layer and inner cement grouting are combined is used for clay and gravel soil areas, and the supporting method that anchoring steel meshes and locking anchor rods are combined is used for rock areas. The overall stability and safety of the supporting structure can be greatly improved, and potential landslide and collapse risks are reduced. The method is high in adaptability, can cope with various different geological conditions, can achieve effective supporting on clay layers, gravel layers and other complex soil layer structures, and can be used in regions with complex geological conditions or varied regions.
Owner:NO 1 ENG CO LTD OF FHEC OF CCCC

Water collection and strong drainage device for soft soil foundation reinforcement treatment

The invention relates to a soft soil foundation reinforcement treatment water collection and strong drainage device, and relates to the technical field of soft soil foundation reinforcement engineering.The soft soil foundation reinforcement treatment water collection and strong drainage device comprises a soft soil foundation body and a water collection box, a grouting layer is arranged on the inner side of the soft soil foundation body, the water collection box is arranged at the bottom of the soft soil foundation body, and a grating is arranged above the water collection box; a first permeable layer and a second permeable layer are arranged in the position, close to the lower portion of the grouting layer, of the soft soil foundation body, and the first permeable layer is located above the second permeable layer. Through layered arrangement of a plurality of reinforcing materials and permeable materials, distribution of drainage mechanisms and laying of a filter screen above a water collection box, fine particles of a soft soil base layer can be prevented from permeating into permeable concrete, and the pore structure of the permeable concrete is prevented from being damaged; the strength and deformation resistance of the soft soil foundation and the moisture infiltration capacity of the soft soil layer are enhanced, and the drainage efficiency is improved.
Owner:NUCLEAR IND SOUTH CHINA HUADU CONSTR ENG

A formwork keel structure for construction

The present invention provides a keel structure for building templates, comprising a keel of a metal structure, a hook assembly fixed under the keel, and side retaining assemblies arranged on the left and right sides of the keel for sealing and connecting; the keel is a profile filled with square wood; the hook assembly comprises a connecting stud, an active card hung on the connecting stud in sequence, a hook plate, a locking nut, and a fixing plate welded at the lower end of the connecting stud; the hook plate arranged under the keel is a symmetrical structure and is vertically fixed under the keel, and both ends of the hook plate are tilted upward to form a hook structure; the present invention aims to provide a keel structure for building templates, after adopting the present invention, the construction and installation are simple, convenient and fast, the disassembly is also convenient, the template will not fall off freely, the template is protected and the engineering safety is enhanced; the demolding of the group unit can be completed independently without the cooperation of multiple people, which greatly improves the engineering efficiency, saves time, saves a lot of manpower and material resources, and the engineering quality is good.
Owner:HAINAN ZHULONG ENGINEERING CONSTRUCTION CO LTD

Automatic pile foundation girdling device

The utility model discloses an automatic pile foundation girdling device, and belongs to the technical field of bridge engineering. The device comprises a hoop, a moving assembly and a cutting assembly. The moving assembly is arranged between the hoop and the cutting device; the moving assembly comprises a mounting seat; one side of the mounting seat is connected with the hoop, and the other side of the mounting seat is connected with the cutting device; the cutting device comprises a controller, a second motor and a blade; the second motor is installed on the other side of the installation base, the controller is located at the top of the second motor, and the blade is located at the bottom of the second motor. The cutting quality problem caused by different manual cutting levels can be solved, meanwhile, the manpower loss can be effectively reduced, the personal safety of workers is guaranteed, and the working efficiency is improved.
Owner:CHINA RAILWAY FIRST GROUP THIRD ENGINEERING CO LTD +1

A construction method for constructing a subway station from an open-cut subway station to a concealed-cut station

The invention discloses a construction method for constructing a dark excavation station from an open-cut subway station, comprising the following steps: constructing the main structure of the open-cut station and reserving construction conditions for the dark excavation part; constructing the dark excavation lower side guide hole and the dark excavation lower middle guide hole from the open-cut station; constructing the lower layer inclined guide hole; constructing the dark excavation upper side guide hole and the dark excavation upper middle guide hole from the open-cut station; constructing the upper layer inclined guide hole; constructing the main structure of the dark excavation station by the hole pile method; and constructing the main structure of the remaining part of the open excavation end wall at the junction of the open and dark excavation. The invention provides a new construction method for constructing a dark excavation station from an open-cut subway station. Compared with the traditional construction method for constructing the dark excavation part from the open-cut station, the method disclosed in the invention solves the problem of dark excavation excavation passage and the problem of temporary stability of the open excavation foundation pit. It has the characteristics of simple construction process, good safety, short construction period, easy to ensure construction quality, low overall comprehensive cost, and has broad promotion prospects in the field of subway station construction.
Owner:CHINA RAILWAY DESIGN GRP CO LTD

A method and system for analyzing rock mass crack correlation in tunnels

The present invention belongs to the technical field of rock mass crack analysis in tunnels, and specifically discloses a method and system for correlation analysis of rock mass cracks in tunnels, the method comprising: respectively obtaining three-dimensional occurrence information of crack surfaces on the surface of a rock mass face to be predicted, and occurrence information of cracks in a borehole; inputting the obtained information into a trained crack correlation prediction model to obtain coplanar crack surface numbers; the present invention can not only more accurately obtain crack occurrence information by comprehensively analyzing digital feature attributes of cracks, but also conduct in-depth research on the correlation between cracks, thereby comprehensively improving the accuracy and reliability of tunnel engineering design and construction.
Owner:SHANDONG UNIV