The invention discloses a main arch ring design method for
rapid construction of a large-span cast-in-
cantilever arch bridge. The main arch ring design method comprises the following steps: establishing a macroscopic finite
element model according to
arch bridge information; a local finite
element model is established for the steel-concrete main arch ring, load
simulation is conducted on the steel-concrete main arch ring, and arch ring information is determined; obtaining an anti-overturning coefficient of the
arch bridge according to the macroscopic finite
element model, and obtaining an anti-seismic
property value of the arch bridge by utilizing anti-seismic
simulation; acquiring
disease early warning information according to the load
simulation and the anti-seismic simulation, and implementing a
disease early warning strategy; load simulation is conducted according to the steel-concrete main arch ring structure through the finite element model, stiffening connection steel plate information and steel hole information of the optimal arch ring strategy are obtained, the
load bearing capacity, the anti-seismic performance and the anti-overturning performance of the arch bridge are improved, the
self weight of the main arch ring is effectively reduced, arch ring steel bars are connected through the stiffening connection
steel plates, and the safety of the arch bridge is improved. Factory-like rapid and high-precision installation of the bottom face is achieved, and the working efficiency and the
engineering safety can be greatly improved through whole-section hoisting.