Water supply and drainage engineering pipeline laying treatment construction method
A construction method and water supply and drainage technology, which are applied in the sewer system, waterway system, water supply device, etc., can solve the problems of high cost, automatic laying of pipelines of different lengths, and no automatic adjustment of fixed-point laying distance, etc., so as to reduce loading. frequency, increase the laying speed and laying efficiency, the effect of changing the opening and closing frequency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways defined and covered by the claims.
[0033] like Figure 1 to Figure 6 As shown, a pipeline laying treatment construction method for water supply and drainage engineering, which uses a pipeline laying device, the pipeline laying device includes a vehicle frame 1, a mobile unit 2 and a laying unit 3, and the pipeline laying method using the above pipeline laying device Also include the following steps:
[0034] S1. Loading operation: place the pipeline in the discharge trough 31 manually or mechanically, and move the device by tractor;
[0035] S2. Alignment operation: Push the positioning plate 331 through the positioning cylinder 32, so that the pipeline placed in step S1 is in contact with the inner wall of the left end of the discharge trough 31;
[0036] S3, positioning operation...