Regional power grid branch off-limit risk probability prediction method and system
A technology for regional power grids and probability forecasting, applied in information technology support systems, forecasting, instruments, etc., can solve problems such as difficulty in technical implementation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] Embodiment 1: In order to improve the accuracy of the regional power grid branch cross-limit risk prediction in the future, according to the linear relationship between the regional power grid branch power and the aggregated load power, the active power of the regional power grid branch in the future period is designed. The probability distribution function of power, the technical difficulty lies in:
[0057] First, how to establish the probability density function of the active power of the regional grid aggregate load at the next moment;
[0058] Second, how to establish the probability distribution function of the active power of each branch of the regional power grid at the next moment.
[0059] Such as figure 1 As shown, in order to overcome the above technical difficulties, the present invention proposes a probabilistic prediction method for regional power grid branch cross-limit risks, including:
[0060] S1 is based on the acquired data of the active power of ...
Embodiment 2
[0129] Embodiment 2: Based on the same inventive concept, the embodiment of the present invention also provides a probabilistic prediction system for regional grid branch cross-limit risks, including:
[0130] The prediction module is used to calculate the probability density function of the active power of each aggregated load at the next moment based on the acquired data of the active power of each aggregated load in the regional power grid;
[0131] The conversion module is used to obtain the probability distribution function of the active power of the branches of the regional power grid at the next moment by using the probability density function of the active power of each aggregated load at the next moment based on the linear relationship between the aggregated load and each branch of the regional power grid;
[0132] The result module is configured to obtain the probability value of each branch power exceeding the limit based on the probability distribution function of t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


