Unlock instant, AI-driven research and patent intelligence for your innovation.

A bogie maintenance process and system based on parts cleaning center

A bogie and cleaning station technology, applied in the direction of railway auxiliary equipment, etc., can solve the problems of high labor intensity of operators, process backflow, and greater impact on the working environment of the bogie maintenance workshop, so as to improve the overall maintenance efficiency and improve the cleaning efficiency. Efficiency and ease of overall planning

Active Publication Date: 2021-11-23
CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, there are many disadvantages in the above-mentioned traditional maintenance process. The main reasons are: first, the cleaning operation is carried out directly in the component maintenance line of the bogie maintenance depot, and the sewage and cleaning chemicals generated during the cleaning process have an impact on the working environment of the entire bogie maintenance workshop. The second is that the cleaning operation is mainly manual cleaning, and the labor intensity of the operators is relatively high; the third is that the process backflow often occurs because the cleaning quality does not meet the requirements of the next process, which affects the maintenance efficiency of the maintenance line, thus restricting Improve the maintenance efficiency of the whole bogie

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A bogie maintenance process and system based on parts cleaning center
  • A bogie maintenance process and system based on parts cleaning center

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040]In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not constitute a conflict with each other.

[0041] figure 1 It is a flow chart of the bogie overhaul process based on the parts cleaning center according to the embodiment of the present invention; figure 2 It is an embodiment of the present invention and a flow chart of centralized cleaning involved in the bogie overhaul process of the parts cleaning center. combine figure 1 with figure 2 , the bogie overhaul process based on parts ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a bogie overhaul process based on a parts cleaning center, which comprises the following steps: dismantling the bogie to be overhauled into a frame, a wheel set, a traction motor and small parts; and transferring them from respective overhaul lines to centralized cleaning Centralized cleaning at the center; transfer the frame, traction motor, and wheel set back to their respective maintenance lines; perform flaw detection, shot blasting, measurement, and painting on the frame, traction motor, and wheel set in sequence on the corresponding maintenance line and drying overhaul; assemble the dismantled and overhauled frame, traction motor, wheel set components, and small parts after overhaul to complete the overhaul of the bogie. The invention also discloses a bogie overhaul system based on the component cleaning center. The wheel set cleaning and the traction motor cleaning are both moved to the centralized cleaning center for centralized cleaning, which can share cleaning resources and transfer tools, and avoid the traditional cleaning operation from affecting the maintenance workshop. negative impact on the environment.

Description

technical field [0001] The invention belongs to the technical field of bogie inspection and repair of high-speed railway EMUs, and is also applicable to the technical field of ordinary railway trains, urban rail transit vehicles, etc., which require bogie inspection and repair. More specifically, it relates to a bogie inspection process based on a component cleaning center and system. Background technique [0002] The high-speed rail EMU bogie is one of the most important components of the high-speed rail EMU. It has the functions of supporting, steering, driving and braking at the same time during the high-speed operation of the train, and it always bears the horizontal, vertical and vertical loads. load. Under such complex working conditions of high speed and heavy load, reliable bogie maintenance is the key link to ensure its safe operation. [0003] At present, the maintenance process of the bogie of the high-speed rail EMU is to disassemble the bogie into components a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B61K11/00
CPCB61K11/00
Inventor 何武山许克亮张浩邱绍峰李加祺韩永军周玲玲蒲思培朱泽群刘宗泽黄世明
Owner CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP