Vertical ship lift large-scale working gate vertical hydraulic hoist boom efficient disassembly device and method
A technology of vertical ship lift and hydraulic hoist, which is applied in the vertical lifting of ship machinery, ship lifting device, metal processing, etc. It can solve the problems of difficult disassembly and assembly of booms, high safety risks, and difficult construction, and meets the requirements of installation The effect of demand, high technical content and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] see Figure 1-6 , a vertical ship lift large working gate vertical hydraulic hoist boom efficient disassembly device, which includes a boom connecting shaft 2 used to disassemble the first section boom 1 and the second section boom 3 The lower platform 6 is disassembled and assembled between the connecting shafts between the booms, and the upper platform 4 is fixed on the top of the lower platform 6 for disassembling the connecting shafts between the booms, and the upper platform 4 is disassembled and assembled between the connecting shafts A jacking shaft tooling 5 is arranged on the top, and a jack 7 for ejecting and dismounting the connecting shaft 2 of the boom is installed on the jacking shaft tooling 5; The connecting door shaft dismounting platform 14 that the hanging rod connecting door shaft 12 is disassembled, the described connecting door shaft disassembling platform 14 cooperates with the jack 7 and the jacking shaft tooling 5 to realize the dismounting of t...
Embodiment 2
[0051] The method for disassembling and assembling the suspender with the high-efficiency disassembly and assembly device for the suspender of the vertical hydraulic hoist with large working gate of the vertical ship lift includes the following steps:
[0052] Step 1: According to the connecting shaft structure between the boom and hoist head, the boom, the boom and the door lug and the structural characteristics of the construction site, combined with the characteristics of the construction process, design and manufacture the connecting shaft between the booms Disassembly and assembly of the lower platform 6, disassembly and assembly of the upper platform 4, the suspension bracket 11 and the jacking shaft tooling 5 between the booms;
[0053] Step 2: According to the operation rules of the hydraulic hoist of the working gate, the working gate 13 is lifted to the working limit range of the first boom 1 through the opening and closing of the hydraulic hoist cylinder 10;
[0054...