Steel ball hard grinding and cleaning equipment
A technology for cleaning equipment and hard grinding, applied to lighting and heating equipment, cleaning methods and utensils, cleaning methods using liquids, etc., which can solve the problems of no equipment cleaning, no steel ball drying, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] refer to Figure 1-5 , a steel ball hard grinding cleaning device, comprising a base 1, a screw 2 is connected to the base 1 for rotation, one end of the screw 2 is threadedly connected to a threaded cylinder 3, the top of the threaded cylinder 3 is fixedly installed with a support column 4, and the top of the base 1 The hinged seat 5 is fixedly installed, and the top of the hinged seat 5 and the top of the support column 4 are fixedly installed with the same equipment body 6, and the first partition plate 7 is fixedly installed in the equipment body 6, and the bottom of the first partition plate 7 is fixedly installed with Water tank 8, drying box 9 is fixedly installed on the right side of equipment body 6, worm rod 11 is fixedly connected on screw rod 2, second partition 12 is fixedly installed in base 1, and one side of second partition 12 is connected with rotation The first rotating rod 13, one end of the first rotating rod 13 is fixedly connected with the worm ge...
Embodiment 2
[0039] refer to Figure 1-5 , a steel ball hard grinding cleaning equipment, comprising a base 1, a screw 2 is connected to the base 1 for rotation, one end of the screw 2 is threadedly connected to a threaded cylinder 3, the top of the threaded cylinder 3 is welded with a support column 4, and the top of the base 1 The hinged seat 5 is welded and installed, the top of the hinged seat 5 and the top of the support column 4 are welded with the same equipment body 6, the first partition plate 7 is welded and installed in the equipment body 6, and the bottom of the first partition plate 7 is welded and installed with The water tank 8, the right side of the equipment body 6 are welded with a drying box 9, the screw 2 is welded with a worm 11, the base 1 is welded with a second partition 12, and one side of the second partition 12 is rotatably connected with a The first rotating rod 13, one end of the first rotating rod 13 is welded with a turbine 14, the turbine 14 is engaged with ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


