A prestressed anchor for bridge construction
A building construction and prestressing technology, applied in bridge construction, construction, bridges, etc., can solve the problems of springback of steel strands, loss of prestressing, shortening of service life of bridges, etc., to achieve convenient adjustment process and ensure prestressed and service life, the effect of improving reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] The main structure of this embodiment, such as Figures 1~4 As shown, it includes steel strand 1, corrugated pipe 2, installation sleeve 3, knob 5, stud 6, moving table 7, connecting assembly, installation cover 10, reinforcement table 11, fixing table 13 and spiral rib 14;
[0028] The corrugated tube 2 is connected with the end of the installation sleeve 3, the steel strand 1 runs through the corrugated tube 2 and the installation sleeve 3, the stud 6 is arranged in the longitudinal direction, one longitudinal end of the stud 6 is rotatably connected with the installation sleeve 3, and the other longitudinal end of the stud 6 is connected to the installation sleeve 3. The knob 5 is connected, the stud 6 is rotatably arranged on the installation cover 10, the stud 6 is threadedly connected with the moving table 7, the installation cover 10 is coaxially arranged on the installation sleeve 3, and the installation cover 10 is provided with an adjustment channel 101 in the ...
Embodiment 2
[0030] This embodiment is based on the above-mentioned embodiment, further, a first folding curtain is connected between one longitudinal end of the adjusting channel 101 and one longitudinal end of the connecting plate 8 , and the other longitudinal end of the adjusting channel 101 and the other longitudinal end of the connecting plate 8 A second foldable curtain is connected between, the first folded curtain and the second folded curtain are both pleated structures, the width of the first folded curtain and the second folded curtain are equal to the width of the adjustment channel 101, and play the role of shielding and protection. The other parts of this embodiment are the same as the above-mentioned embodiments, and are not repeated here.
Embodiment 3
[0032] In this embodiment, on the basis of the above-mentioned embodiment, a first installation groove 301 is further provided on the installation sleeve 3, and the end of the installation cover 10 away from the knob 5 is embedded in the first installation groove 301, and the installation process is carried out. positioning, and improve the reliability of installation. The other parts of this embodiment are the same as the above-mentioned embodiments, and are not repeated here.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


