Supercharge Your Innovation With Domain-Expert AI Agents!

Device for transporting construction materials in floors

A technology of floors and horizontal positions, applied in the direction of transportation and packaging, single-axis trolleys, trolleys, etc., can solve the problems of labor-consuming, affecting the construction progress of the site, and low construction efficiency, so as to save labor, improve construction efficiency, and facilitate application Effect

Pending Publication Date: 2021-02-09
宝冶(郑州)建筑工程有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The construction materials (steel pipes, formwork and wooden squares) in one floor often take several days to be transported, which also consumes a lot of labor, and the construction efficiency is low, which affects the construction progress on site
In today's environment with tight construction schedules and high labor costs, it is not advisable to use manual handling of materials

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Device for transporting construction materials in floors
  • Device for transporting construction materials in floors
  • Device for transporting construction materials in floors

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0021] A device for transporting construction materials within a floor, see figure 1 , figure 2 with image 3 , including two wheels 1, also includes a connecting pipe 2, a plurality of fasteners 3, four vertical pipes 4, three bottom support pipes 5, two connecting support pipes 6 and two placement pipes 7, the fasteners 3 are selected Cross fastener. The two wheels 1 are respectively connected to the front and rear ends of the connecting pipe 2, and the connecting pipe 2 is provided with three fasteners 3. Among the three fasteners 3 on the connecting pipe 2, one is set near the middle of the connecting pipe 2, and the other two One is arranged close to two wheels 1 respectively, and three fasteners 3 on the connecting pipe 2 are connected with a bottom support pipe 5 respectively, and the two ends of the bottom support pipe 5 are respectively positioned at the left and right sides of the connection pipe 2; The connecting pipes 2 are arranged in parallel, and two connect...

Embodiment 2

[0029] A device for transporting construction materials within floors, the structure of which can be found in figure 1 , figure 2 with image 3 , the difference from Embodiment 1 is that in Embodiment 1, a round tube sleeve 8 is set on the tube body between the two fasteners 3 provided on it, and in this embodiment The tube body between the two fasteners 3 on which the placement tube 7 is located is provided with two round tube sleeves 8 . The setting of the two round pipe sleeves 8 can make the material to be transported more firmly placed on the placement pipe 7, and its position on the placement pipe 7 can be adjusted to a certain extent, making the use of the present invention more stable. flexible.

[0030] It is also possible to set three or more round pipe sleeves 8 on the pipe body between the two fasteners 3 on which the placement pipe 7 is located, so that different materials can be classified and placed.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a device for transporting construction materials in floors. The device for transporting construction materials in floors comprises two wheels, and further comprises a connecting pipe, a plurality of fasteners, four vertical pipes, three bottom supporting pipes, two connecting supporting pipes and two placing pipes, the four vertical pipes, the three bottom supporting pipes,the two connecting supporting pipes and the two placing pipes are mutually connected through a plurality of fasteners to form a vehicle body structure, the placing pipes are located on a pipe body between the two fasteners arranged on the placing pipes and are at least sleeved with one round pipe sleeve, a blocking pipe is vertically arranged on the outer pipe wall of the round pipe sleeve, and the inner diameter of the round pipe sleeve is larger than the outer diameter of the placing pipes. A threaded through hole leading into the sleeve is formed in the pipe wall of the round pipe sleeve,and a fixing bolt is mounted in the threaded through hole. When used for transporting materials, the material transporting device places the materials on the placing pipes, workers pull the wheels through the placing pipes to transport the materials, manual carrying is not needed, the construction efficiency is improved, and labor force is saved.

Description

technical field [0001] The invention relates to the field of building material transport devices, in particular to a device for transporting construction materials in floors. Background technique [0002] With the development of society, especially the advancement of science and technology, the rapid development of social productivity has been greatly promoted, and people's lives have been greatly improved and improved, especially many tall buildings have sprung up like mushrooms after rain. , greatly promoted the pace of development of the socialization process. [0003] During construction on the construction site, material transportation has always been a major task, and the speed of material transportation can also dominate the progress of on-site construction. When transporting materials in the floors of the current site, because tower cranes cannot be used to transport materials, they are generally transported manually. The construction materials (steel pipes, formwo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): B62B1/10B62B1/00
CPCB62B1/10B62B1/008
Inventor 丁兵长苏秀马杰刘召黄罡
Owner 宝冶(郑州)建筑工程有限公司
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More