Unlock instant, AI-driven research and patent intelligence for your innovation.

A method for assembling a steel truss bridge

An assembly method and technology for steel bridges, applied in the field of bridge structures, can solve the problems of unstable bridge deck support strength and support position, affecting the safety and service life of the whole bridge, and reduce the sliding process, prolong the service life, and ensure the strength. balanced effect

Active Publication Date: 2022-04-19
长城海工装备(江苏)有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The prefabricated steel bridge is a common temporary bridge facility, which is an upper and lower bearing bridge with single-pin connection truss units as the main girder of the bridge span structure. In the installation process of the prefabricated steel bridge in the prior art, it is often The installation of the bridge deck is realized by installing the grid bridge deck between the two connected beams. Then, due to the different installation positions and structural strength requirements, the installation grid bridge deck used for the bridge deck in the prior art is often based on In the actual situation, panels with different parameters are selected. At the same time, due to installation errors and other reasons during installation, the support strength and support position of the bridge deck will be unstable, which will affect the safety and service life of the entire bridge.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for assembling a steel truss bridge
  • A method for assembling a steel truss bridge
  • A method for assembling a steel truss bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] The present invention is described in further detail now in conjunction with accompanying drawing. These drawings are all simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, so they only show the configurations related to the present invention.

[0038] Such as Figure 2-4 As shown, it is a truss steel bridge provided by the present invention. The truss steel bridge includes long beams 1 and short beams 2 that are parallel to each other and arranged at intervals. Several groups of truss structures 3 connected to each other are provided with reinforcing chord beams 4 at the top of each truss structure 3, and diagonal brace assemblies 5 are also provided between the left and right ends of the long beam 1 and the truss structures 3. A grid bridge deck is laid on the top of the adjacent two long beams 1 and short beams 2;

[0039] The long beam 1 includes a long beam body 1-1, the long beam connecting pl...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an assembly method of a truss steel bridge; the long beam detection device and the short beam detection device respectively detect the corresponding parameters of the grid bridge deck above them and send the parameters to an external controller, and the external controller responds to the received The parameters correspond to control the sliding of the long beam resting plate in the left and right directions inside the long beam body and the sliding of the short beam resting plate in the left and right direction inside the short beam body, so that according to the position, material, thickness and other parameters of the upper grid bridge deck In order to determine the position and quality of the grid bridge deck, and then adjust the long beam resting plate and the short beam resting plate to achieve stable support for the grille bridge deck, ensure its stable installation, ensure its safe use, and prolong its use life.

Description

technical field [0001] The invention relates to a bridge structure, in particular to an assembly method of a truss steel bridge. Background technique [0002] The prefabricated steel bridge is a common temporary bridge facility, which is an upper and lower bearing bridge with single-pin connection truss units as the main girder of the bridge span structure. In the installation process of the prefabricated steel bridge in the prior art, it is often The installation of the bridge deck is realized by installing the grid bridge deck between the two connected beams. Then, due to the different installation positions and structural strength requirements, the installation grid bridge deck used for the bridge deck in the prior art is often based on In the actual situation, panels with different parameters are selected. At the same time, due to installation errors and other reasons during installation, the support strength and support position of the bridge deck will be unstable, whic...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 鲁传宝陈芳平陈荣斌庄瑞
Owner 长城海工装备(江苏)有限公司